Machine Studies
Schedule for Run01-2, 2008
February 5th 0800 - February 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 2/5/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0810-0900 |
Multipactor studies |
Cours |
Limited Injection |
0900-1100 |
PEM testing |
Shang/Schroeder |
No beam |
0900-1100 |
Linac operator training |
Karl |
Limited Injection |
0900-0930 |
Switch back to primary bunch I monitor |
Lenkszus |
No Beam |
0900-1000 |
19ID PSS end to end test |
McNamara |
No Beam |
0900-1100 |
Installation of Cherenkov boards |
Yang |
No Beam |
0900-1100 |
Modify CPU V-coil regulator |
Deriy |
No Beam |
0930-1000 |
Connect SR Injection Trigger signal to DSP Scope Ext Trig Input |
Lenkszus |
No Beam |
0930-1100 |
Troubleshoot S38/C2 tuner |
Horan |
Access Zone F |
0930-1030 |
Check Conditioning Validity Pvs |
Sajaev, Xu |
No beam |
1100-1130 |
Recover SR systems |
Ops/FMS |
Stored beam & Inj. |
1130-1230 |
test SR tune measurement with MXA |
Yao, Gold |
Stored beam |
1130-1430 |
Investigate PAR Harmonic #2 Amplifier |
Grelick, Smith, Yao, Di Monte |
Limited injection |
1130-1430 |
Measurement of Cherenkov Detector Output |
Yang, Brill |
No impact |
1130-1330 |
Testing of new version of sddsfeeforward for ID11 Xray bpm feedforward |
Shang, Emery |
Stored beam |
1430-1630 |
Text mixer based front-end electronics for P0 feedback |
Yao |
Stored beam |
1430-1630 |
PEM testing and updating files for Kx down modes |
Pasky |
Limited injection |
1630-2000 |
Tune Linac/Par/Booster for 300MeV, possibly 275MeV |
Sereno, Yao, Pasky, Jones |
Limited injection |
1630-1730 |
Fix chromaticy GUI for use with NASA |
Emery, Shang |
Stored beam |
1800-2000 |
Checking CPU with new external triggering |
Emery, Xiao |
Stored beam |
2000-2400 |
Investigate beam lifetime problems |
Xiao |
Stored beam & Inj. |
|
Wednesday, 2/6/08 |
|
|
0000-0400 |
Lower S1 for hybrid mode |
Sajaev |
Stored beam & Inj. |
0400-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |