Schedule for Run01-3, 2008
February 11th 0800 - February 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, 2/11/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0930 |
Switch water pumps |
Ferry |
No Beam |
0900-1000 |
Install fanout module S3BPM |
Laird |
No Beam |
0900-1030 |
Swap Libera processor in iocs38bpm |
Lenkszus |
No Beam |
0900-1100 |
Replace DG535 timing delay generators |
Grelick |
No Injection |
0900-1100 |
Investigation of SD power slope |
Puttkammer |
No injection |
0900-1200 |
NRTL on Booster Corrector Power Supplies |
Puttkammer |
No injection |
0900-1100 |
Test conditioning validity bit |
Sajaev |
Reboot VP iocs |
0900-1100 |
Install Cherenkov detectors (requires power cycle of BPM IOCs) |
Yang, Brill |
No Beam / BPM power cycle |
0900-1300 |
cathode emission check on the RF5 klystron |
Horan |
No Beam (limited injection after 1200) |
0900-0930 |
Prepare for Access |
OPS/FMS |
No beam |
0930-1030 |
Replace linear encoder for 12-ID |
Grimmer |
Zone B Access |
1000-1200 |
Tune measurement system work |
Yao |
No Beam |
1030-1200 |
Investigate why primary bunch current monitor Linux box doesn't install needed ADC driver |
Lenkszus |
No beam |
1030-1130 |
Recover from Access |
OPS |
No beam |
1100-1300 |
Troubleshoot PAR RF system 2 |
Grelick |
Limited injection |
1200-1600 |
Investigate lifetime problems (324 singlets using the 24 singlet lattice) -- #1 |
Xiao |
Stored beam & occ. injection |
1400-1600 |
Investigate Par Double Bunching |
Yao |
Occasional injection |
1600-2000 |
Rad Monitor Studies |
Yang, Harkay |
Stored beam & Injection |
2000-2200 |
Linac/PAR training (1500-2300) |
Fystro |
Limited injection |
2200-2400 |
Set up S8-S32 RHB lattice |
Sajaev |
Stored beam & Inj. |
|
Tuesday, 2/12/08 |
|
|
2300-0200 |
Set up S8-S32 RHB lattice |
Sajaev |
Stored beam & Inj. |
0200-0600 |
Set-up Reference Lattice |
Sajaev, Emery |
Stored beam & injection |
0600-0700 |
Check RTFB external trigger |
Emery, Lenkszus |
No beam |
0700-1000 |
CPU Compensation |
Emery, Xaio |
Stored Beam |
0700-1000 |
Measure PAR lattice, tunes, dispersion |
Sereno |
Limited injection |
1000-1200 |
Beam optimization for 30-ID (shutter permit needed) |
Schroeder/30-ID |
Stored beam & injection |
1000-1300 |
Measurement of Cherenkov Detector Output (Top-up needed but can be parasitic) |
Yang, Brill |
Stored beam & injection |
1200-1300 |
Run Top-up w/o RTFB to verify BPLD limit difference alarms |
Schroedr/OPS |
Stored beam & injection |
1300-1700 |
Investigate lifetime problems (324 singlets using the 24 singlet lattice) -- #2 |
Xaio |
Stored beam & occ. injection |
1700-2000 |
Test FPGA SR Tune Measurement System (Tuesday or later) |
Yao, Norum |
Little or no impact |
1800-2000 |
Linac/PAR training (1500-2300) |
Fystro |
Limited injection |
2000-2400 |
Continue hybrid with lower S1 sextupoles |
Sajaev |
Stored beam & injection |
|
Wednesday, 2/13/08 |
|
|
0000-0330 |
realtime feedback studies |
Decker/Sun |
Stored Beam & Injection |
0330-0700 |
XBPM data collection 24 bunches top-up |
Decker |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |