Machine Studies
Schedule for Run01-4, 2008
February 19th 0800 - February 20th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 2/19/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Repair L2 Water Skid heater |
Wright |
No Injection |
0900-0930 |
Switch from pump 504 to 503 |
Ferry |
No impact |
0900-1100 |
Troubleshoot B:IK power supply |
Puttkammer |
No Injection |
0900-1200 |
Replace S7A:P0 Bergosz module |
Sun |
No beam |
0900-1200 |
Investigate 21-ID FE-EPS water flow trips |
McNamara |
No beam |
0900-1100 |
Troubleshoot PAR RF-12 self-bunching |
Grelick |
Limited Injection |
0900-1100 |
Repair/check analog read backs on SRPS |
PS group |
No Beam |
0900-1300 |
Measure sextupole currents with clamp-on meter |
PS group |
No beam |
1100-1400 |
Investigate PAR Amplifier #2 problem |
Grelick |
Limited Injection |
1500-1515 |
Reboot iocsrtune (requires no top-up) to add PV/button to disconnect the tune drive signal |
Yao, Stevens |
No impact |
1300-1500 |
Test FPGA based SR tune measurements (24 singlets) |
Yao, Norum |
Stored Beam |
1300-1500 |
Documentation of SR PEMs (parasitic) |
Schroeder |
Stored Beam |
1400-1800 |
Investigate Booster efficiency problems |
Sereno, Borland, Jones |
Occ. Injection |
1500-1900 |
CPU coupling correction using new method |
Xiao, Emery |
Stored beam |
1800-2100 |
Optimize 300MeV PAR set-up |
Yao, Sereno |
Occ. Injection |
1900-2300 |
Continue investigation of beam lifetime (324 singlets stored in 24 singlet standard lattice) |
Xiao |
Stored beam & Occ. Injection |
2100-2300 |
Operator training (1500-2300) Linac/PAR |
Karl |
Limited Injection |
2300-2400 |
Operator training (2300-0700) |
Fystro |
Limited Injection |
2300-2400 |
Continue setting up RHB lattice (limited injection first two hours) |
Sajaev |
Stored beam & inj. |
|
Wednesday, 2/20/08 |
|
|
0000-0100 |
Operator training (2300-0700) Linac/PAR |
Fystro |
Limited injection |
0000-0400 |
Continue setting up RHB lattice |
Sajaev |
Stored beam & Inj. |
0300-0700 |
Continue reference lattice |
Sajaev |
Stored beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |