Machine Studies
Schedule for Run01-9, 2008
March 24th 0800 – March 26th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, 3/24/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0930 |
Switch from SRF-3 to SRF-2 |
RF group |
No Beam |
0900-0930 |
Reboot interleaving PS DSPs |
Puttkammer |
No Injection |
0900-1000 |
Test Linac gun switch BESOCM test |
Pasky, Hogrefe |
No Injection |
0900-1000 |
Reboot iocparawg |
Norum |
No impact |
0900-1000 |
Install cable from S1 cabinet 3 to S2 P0 FB rack |
Gold |
No Impact |
0900-1100 |
Replace PAR RF-1 meter relay |
Grelick |
No Injection |
0900-1100 |
SR converter calibration tests |
PS group |
No Beam |
0900-1300 |
NRTL inspections on SR Converters in Zone A |
Puttkammer |
No Beam |
0930-1030 |
Troubleshoot RF4 klystron calorimetry |
RF group |
No Beam |
0930-1030 |
Investigate RF5 sideband instability |
RF group |
No Beam |
0930-1130 |
Repair Sector 11 Cherenkov detector |
Yang |
Access Zone B |
1230-1400 |
SR training (setting up for injection, 1st half hour) |
Schroeder/ Pasky |
Stored beam & top-up |
1300-1400 |
Investigage X-ray problem with RF2 |
RF Group |
Stored beam& top-up |
1400-1600 |
Test new positional steering optimization feature |
Schroedr/ Graber |
Stored beam & injection |
1600-1800 |
Set-up RHB lattice |
Emery/Sajaev |
Stored beam & Injection |
1800-2400 |
Orbit recovery (start with hybrid fill, then RHB 24 singlets) |
Decker/Emery/ Sajaev |
Stored beam & injection |
|
Tuesday, 3/25/08 |
|
|
0000-0400 |
Continue SPX lattice |
Sajaev |
Stored beam & injection |
0400-0600 |
PAR Operator training |
Fystro |
Limited injection |
0600-0800 |
OPEN |
|
|
0800-1100 |
Calibration of Cerenkov detectors (80-100mA no top up) |
Yang |
Stored beam |
0800-1000 |
Install new epics software in iocparwg |
Norum/Yao |
No injection |
1000-1100 |
Test new bunch cleaning application |
Yao/Shang |
No injection |
1100-1300 |
Explore using tune measurement system to control blow up vertical size with minimized coupling and dispersion |
Yao/Emery |
Stored beam & injection |
1300-1700 |
Test new booster long controllaw |
Sereno |
Occasional injection |
1300-1700 |
Test new P0 Feedback front end electronics (24 singlets) |
Yao/Decker |
Stored beam |
1700-2000 |
Real-time feedback studies |
Decker/Sun |
Stored beam & injection |
1800-2000 |
PAR Operator training |
Karl |
Limited injection |
2000-2400 |
Continue design quads |
Sajaev |
Stored beam & injection |
|
Wednesday, 3/26/08 |
|
|
2400-0200 |
Continue design quads |
Sajaev |
Stored beam & injection |
0200-0400 |
PAR operator training |
Fystro |
Limited injection |
0400-0630 |
OPEN |
|
|
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |