Machine Studies
Schedule for Run02-1, 2008
June 3rd 0800 – June 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 6/03/08 |
|
|
0800-1000 |
BM xbpm checkout. |
Hahne |
Stored Beam & Injection |
1000-1400 |
DBPLD validation. |
Bui |
Stored Beam & Injection |
1400-1600 |
ID xbpm checkout. |
Hahne |
Stored Beam & Injection |
1600-2000 |
BPM system checkout. |
Decker |
Stored Beam & Injection |
2000-2200 |
PAR/Booster training. |
Karl |
Occasional injection |
2200-2300 |
Test SR tune system. |
Yao Gold |
Stored Beam & Injection |
2300-2400 |
Verify PAR scope mux signals. |
Yao Gold |
Stored Beam & Injection |
|
Wednesday, 6/04/08 |
|
|
0000-0200 |
PAR/Booster training. |
Fystro |
Stored beam & injection |
0200-0800 |
BPM offset measurements. |
OPS |
Stored beam & injection |
0800-1600 |
Initial orbit recovery. |
Decker Emery Sajaev |
Stored Beam & Injection |
1600-1800 |
PAR/Booster training. |
Karl |
Stored Beam & Injection |
1800-2200 |
Beta function correction. |
Sajaev |
Stored Beam & Injection |
2200-2400 |
Check CPU DC mode. |
Emery Xiao |
Stored Beam & Injection |
|
Thursday, 6/05/08 |
|
|
0000-0200 |
Check CPU DC mode (continued). |
Emery Xiao |
Stored beam & injection |
0200-0400 |
PAR/Booster training. |
Fystro |
Stored Beam & Injection |
0400-0800 |
OPEN |
|
|
0800-1200 |
PSS shutter tests. |
SI group |
NO BEAM |
0800-1200 |
Linac PEM testing. |
Pasky |
|
0800-0900 |
RF waveguide switch. |
RF group |
|
1200-2000 |
Final orbit recovery. |
Decker Emery Sajaev |
Stored Beam & Injection |
2000-2400 |
Check CPU AC mode. |
Emery Xiao |
Stored Beam & Injection |
|
Friday, 6/06/08 |
|
|
0000-0200 |
PAR/Booster training. |
Fystro |
Stored Beam & Injection |
0200-0800 |
OPEN |
|
|
0800-1200 |
Test P0 feedback system. |
Yao |
Stored Beam & Injection |
1200-1800 |
CPU correction. |
Emery Xiao |
Stored Beam & Injection |
1800-2200 |
Test P0 feedback system. |
Yao |
Stored Beam & Injection |
1800-2400 |
OPEN |
|
|
|
Saturday, 6/07/08 |
|
|
0000-0200 |
PAR/Booster training. |
Karl |
Stored Beam & Injection |
0200-0800 |
OPEN |
|
|
0800-1200 |
PEM testing with beam. |
Schroeder OPS |
Stored Beam & Injection |
1200-2000 |
Xbpm system recommissioning. |
Decker |
Stored Beam & Injection |
2000-2400 |
Operational topup check. |
OPS |
Stored Beam & Injection |
|
Sunday, 6/08/08 |
|
|
0000-0400 |
Operational topup check (continued). |
OPS |
Stored Beam & Injection |
0400-0600 |
PAR/Booster training. |
Karl |
Stored Beam & Injection |
0600-1200 |
OPEN |
|
|
1200-1600 |
Lifetime and energy aperture measurements. |
Borland |
Stored Beam & Injection |
1600-2400 |
OPEN |
|
|
|
Monday, 6/09/08 |
|
|
0000-0800 |
OPEN |
|
|
0800-0900 |
RF waveguide switch. |
RF group |
NO BEAM |
0900-1100 |
Optimize injection. |
Emery Sajaev |
Stored Beam & Injection |
1100-1500 |
Study beam histories with bunch train. |
Emery Sajaev |
Stored Beam & Injection |
1500-1900 |
Perform tune scans. |
Emery Sajaev |
Stored Beam & Injection |
1900-2100 |
Test PAR ACM waveform. |
Yao |
Stored Beam & Injection |
2100-2400 |
BPLD studies |
Emery Sajaev |
Stored Beam & Injection |
|
Tuesday, 6/10/08 |
|
|
0000-0300 |
Model measurement. |
Sajaev |
Stored Beam & Injection |
0300-0600 |
OPEN |
|
|
0600-0800 |
Prepare for user run. |
OPS |
Stored Beam & Injection |