Machine Studies
Schedule for Run02-3, 2008
June 24th 0800 - June 25th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 6/24/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Replace / install Cherenkovs S1, 3, & 5 |
Yang |
No Beam |
0900-0930 |
Reboot ioclibpm2 |
Pietryla |
Limited injection |
0900-1000 |
Investigate stripline non-beam noise |
Yao |
Stored Beam & Injection |
0900-1000 |
Switch from SRF-2 to RF-3 |
RF Group |
No Beam |
0900-1200 |
L5:TW:VP work |
Grelick |
No Beam |
0900-1100 |
Install UPS outlets in D1128A |
Gibson |
Limited Injection |
0900-1500 |
2 hrs PAR operator training |
Karl |
Limited Injection |
1000-1200 |
Test RF5 AFG | Lower T-R cooling setpoints |
Horan |
No Beam |
1200-1230 |
Inject 102 mA in 324 bunches. |
OPS |
Stored Beam & Injection |
1230-1600 |
Continue 300MeV PAR/Booster injection. |
Sereno |
No injection |
1230-1600 |
CPU AC mode correction (parallel to 300MeV injection). |
Emery Xiao |
Stored Beam |
1600-1800 |
Study BPLD limits in vertical plane. |
Emery |
Stored Beam & Injection |
1800-2200 |
Lifetime study. |
Borland |
Stored Beam & Injection |
2200-2400 |
Monopulse BPM timing scan (or X-bpm studies). |
Decker |
Stored Beam & Injection |
|
Wednesday, 6/25/08 |
|
|
0000-0200 |
Monopulse BPM timing scan (continued). |
Decker |
Stored Beam & Injection |
0200-0600 |
P0 feedback test. |
Yao |
Stored Beam & Injection |
0600-0700 |
Investigate PAR timing/phase. |
Yao |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |