Machine Studies

Schedule for Run02-5, 2008

July 15th 0800 – July 16th 0800

Time

Descriptions

Studiers

SR Status

 

Tuesday, 7/15/08

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-0915

Reboot interleaving DSPs

Fors

No Injections

0900-1000

L5 Ion pump controller work

Grelick

Limited Injection

0900-1000

Install MFI100 in iocs37fb

Lenkszus

No Beam

0900-1100

Replace RF5 klystron garage blower

Horan

Limited Injection

0900-1100

Electrical work in back of MCR rack room

Gibson

No Impact

0900-1130

Replace Cerenkov detectors in S1-12

Brill

No Beam

0930-1030

Adjust S14 limit switches

Grimmer

Access Zone B

0930-1130

Installation of LCLS BLM prototype

Yang

Access Zone B

1130-1200

Restore beam in the storage ring.

OPS

Stored Beam & Injection

1200-1400

Install and test software for MFI100.

Lenkszus

Stored Beam & Injection

1400-1600

12ID shutter thermal studies. Shutter open required.

Capatina

Stored Beam & Injection

1600-2000

Orbit recovery.

Emery Sajaev Decker

Stored Beam & Injection

2000-2400

Photon beam alignment. 324 bunches.

Decker

Stored Beam

2000-2200

PAR/Booster training. Parallel to photon beam alignment.

Fystro

Limited Injection

 

Wednesday 7/16/08

 

 

0000-0300

Characterization of the beam perturbation during charging of the kickers.

Emery Sajaev

Stored Beam & Injection

0300-0700

Prepare hybrid lattice.

Emery Sajaev

Stored Beam & Injection

0700-0800

Prepare for user Operations (324 singlets – non Top-Up)

Ops

Stored Beam & Injection