Machine Studies
Schedule for Run02-5, 2008
July 15th 0800 – July 16th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 7/15/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0915 |
Reboot interleaving DSPs |
Fors |
No Injections |
0900-1000 |
L5 Ion pump controller work |
Grelick |
Limited Injection |
0900-1000 |
Install MFI100 in iocs37fb |
Lenkszus |
No Beam |
0900-1100 |
Replace RF5 klystron garage blower |
Horan |
Limited Injection |
0900-1100 |
Electrical work in back of MCR rack room |
Gibson |
No Impact |
0900-1130 |
Replace Cerenkov detectors in S1-12 |
Brill |
No Beam |
0930-1030 |
Adjust S14 limit switches |
Grimmer |
Access Zone B |
0930-1130 |
Installation of LCLS BLM prototype |
Yang |
Access Zone B |
1130-1200 |
Restore beam in the storage ring. |
OPS |
Stored Beam & Injection |
1200-1400 |
Install and test software for MFI100. |
Lenkszus |
Stored Beam & Injection |
1400-1600 |
12ID shutter thermal studies. Shutter open required. |
Capatina |
Stored Beam & Injection |
1600-2000 |
Orbit recovery. |
Emery Sajaev Decker |
Stored Beam & Injection |
2000-2400 |
Photon beam alignment. 324 bunches. |
Decker |
Stored Beam |
2000-2200 |
PAR/Booster training. Parallel to photon beam alignment. |
Fystro |
Limited Injection |
|
Wednesday 7/16/08 |
|
|
0000-0300 |
Characterization of the beam perturbation during charging of the kickers. |
Emery Sajaev |
Stored Beam & Injection |
0300-0700 |
Prepare hybrid lattice. |
Emery Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for user Operations (324 singlets – non Top-Up) |
Ops |
Stored Beam & Injection |