Machine Studies
Schedule for Run03-1, 2008
September 24th 0800 – October 1st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 9/23/08 (pre-studies) |
|
|
1000-1400 |
Initial Setup of 35-BM Pinhole camera image |
Yang |
Stored Beam & Top-up |
|
Wednesday, 9/24/08 |
|
|
0600-0800 |
BM Xbpm checkout |
Hahne |
Stored Beam |
0800-1200 |
BPLD validations |
Bui |
Stored Beam & Inj. |
1200-1400 |
Booster training |
Karl |
Occ. Inj. |
1200-1500 |
X-ray BPM checkout |
Hahne |
Stored Beam & Occ. Inj. |
1500-1900 |
RF BPM checkout |
Decker/Sun |
Stored Beam & Inj. |
1900-2300 |
CPU multipole alignment measurement (324 singlets) |
Emery |
Stored Beam & Occ. Inj. |
2300-2400 |
CPU dipole correction (324 singlets) |
Emery |
Stored Beam & Inj. |
|
Thursday, 9/25/08 |
|
|
0000-0300 |
CPU dipole correction (324 singlets) |
Emery |
Stored beam & inj. |
0300-0500 |
Booster training |
Fystro |
Occ. Inj. |
0500-0700 |
OPEN |
|
|
0700-0800 |
Shut down equipment in preparation for Booster Studies |
OPS |
No beam |
0800-1400 |
Booster Dipole study |
Yao, Guang |
No beam |
0800-1000 |
Update SCRs for different LINAC modes |
Pasky |
No beam |
0900-1300 |
Verify changes on setting ID gaps to minimum scripts |
Shang, Schroeder |
No beam |
1400-2000 |
Unexpected repairs to Booster kicker and S24A:H3 |
PS Group |
No beam |
2000-2200 |
Determine RF power needed for closing gaps to minimum values |
Schroeder, RF Group |
Stored beam & top-up |
2200-2400 |
Orbit Recovery |
Decker/Sun |
Stored beam & Inj. |
|
Friday, 9/26/08 |
|
|
1600-2200 |
Orbit Recovery |
Decker/Sun |
Stored beam & injection |
0200-0400 |
Booster training |
Fystro |
Occ. Inj. |
0200-0900 |
Beta function correction and model measurement (stored beam only for 1st two hours) |
Sajaev |
Stored beam & injection |
0900-1300 |
Test P0 feedback electronics and FPGA firmware (single bunch) |
Yao, DiMonte |
Stored beam & Inj. |
1300-1500 |
Booster training |
Karl |
Occ. Injection |
1300-1500 |
Shielding verification 16-ID-E (requires shutters open) Max 50mA |
Ramanathan/ UES |
Stored Beam |
1300-1700 |
Calibrate and align new setup for 30-ID beamline optimization (shutters open), Max 50mA |
Ramanathan |
Stored Beam |
1700-2000 |
Initial calibration of Cerenkov detectors |
Yang |
Stored Beam & Injection |
2000-2400 |
CPU testing + initial test of corrector punch down software |
Emery |
Stored Beam & injection |
|
Saturday, 9/27/08 |
|
|
0000-0300 |
Test S24A:H3 in operations mode |
P.S. Group |
No beam |
0300-0600 |
OPEN |
|
|
0600-1000 |
LCLS-BLM prototype studies |
Yang, Dooling |
Stored beam & injection |
1000-1200 |
Set-up bunch purity |
Yang |
Stored beam & injection |
1200-1800 |
X-bpm database work |
Decker |
Stored beam & injection |
1800-2400 |
Instability study with all RHB lattice (24 singlets) |
Harkay |
Stored beam & inj. |
|
Sunday, 9/28/08 |
|
|
0000-0900 |
OPEN |
|
|
0900-1700 |
PC Gun Studies |
Sereno, Lumpkin |
No injection |
1700-2100 |
300MeV top up test |
Sereno, Emery |
Stored beam & inj. |
2100-2400 |
Cerenkov Detector Studies |
Yang, Emery |
Stored beam & inj. |
|
Monday 9/29/08 |
|
|
0000-0400 |
OPEN |
|
|
0400-0800 |
Beam loss for unstable beams (24 singlets and maybe 324 singlets) |
Harkay, Dooling |
Occ. Injection |
0800-0900 |
Trace fiber signal in Linac timing |
Pietryla |
No Injection |
0800-0830 |
Prepare for Access |
Ops |
No Access |
0800-1200 |
PSS shutter checkouts |
SI Group |
No Beam |
0900-1100 |
Booster training (booster beam needed) |
Fystro |
No Beam |
0830-1130 |
Install radiation shielding on S9&12 IDs |
Merritt/ Grimmer |
Zone B Access |
1000-1200 |
Restore booster tune measurement after equipment change (booster beam needed) |
Yao |
No beam |
1000-1200 |
Test ID optimization intensity script |
Shang, Schroeder |
No beam |
1200-1500 |
Possible Zone A Access to move S4 CPU |
Merritt/ Grimmer |
No beam |
1500-2300 |
Final Orbit recovery |
Decker |
Stored Beam, Top-Up |
2300-2400 |
Top-up verification (gaps closed to user values) |
OPS |
Stored Beam, Top-Up |
|
Tuesday 9/30/08 |
|
|
2400-0600 |
Top-up verification (gaps closed to user values) |
OPS |
Stored beam, Top-up |
0600-1000 |
Test P0 feedback electronics and FPGA firmware (single bunch) |
Yao, DiMonte |
Stored beam & Inj. |
1000-1300 |
Test new version of corrector punchdown with datapool only |
Yao, Shang |
Stored beam & Injection |
1300-1500 |
Steering optimation with 30-ID, max. 50mA (shutters open required) |
Ramanathan, Ops |
Stored beam |
1500-1900 |
Final set-up of pinhole camera |
Yang |
Stored beam & injection |
1900-2300 |
Optimize injection |
Emery |
Stored beam & injection |
2300-2400 |
OPEN |
|
|
|
Wednesday 10/01/08 |
|
|
0000-0600 |
OPEN |
|
|
0600-0800 |
Prepare for User Operations (24 singlets – Top-up) |
Ops |
Stored Beam & Injection |