Machine Studies
Schedule for Run03-3, 2008
October 14th 0800 - October 15th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 10/14/08 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0900-1000 |
Troubleshoot S28B:Q3 P.S. |
Puttkammer |
No injection |
0900-1000 |
Troubleshoot Switch-to-User-Mode PEM problem reported by Operators |
Schroeder/ Shang |
No injection |
0900-1100 |
Investigate PTB:Q7 P.S. |
Puttkammer |
No injection |
0900-1100 |
CMPSI Clock Edge studies in sector 24 |
T. Fors, B. Laird, F. Lenkszus |
No beam |
0900-1100 |
Investigate phase under-voltage fault @RF5 |
Horan |
No Injection |
0900-1500 |
Investigate CPU |
Deriy |
No Beam 0900-1200 Stored beam & injection 12-15 |
0930-1130 |
Replace S15 Cherenkov Detector PMT |
Yang |
Access Zone B |
1100-1300 |
Update RG1 Mode Files |
Pasky |
Limited Inj. |
1130-1200 |
Recovery Storage Ring |
OPS |
No beam |
1300-1500 |
Booster training |
Pasky/Jones |
Limited Inj. |
1500-1700 |
Tune shift versus current measurement (single bunch) |
Emery |
Stored beam & injection |
1700-1800 |
Measure dynamic aperature |
Emery |
Stored beam & injection |
1800-2200 |
16 mA bunch checking |
Sajaev |
Stored beam & injection |
2200-2400 |
Vertical impedance measurement by RM method |
Sajaev |
Stored beam & Occasional Inj. |
2200-2400 |
Tune up Booster for 300MeV injector setup |
Sereno |
Stored beam & Injection |
|
Wednesday, 10/15/08 |
|
|
0000-0100 |
Vertical impedance measurement by RM method (continued) |
Sajaev |
Stored beam & Occ. Inj. |
0000-0200 |
Tune up Booster for 300MeV injector setup |
Sereno |
Stored beam & Injection |
0200-0400 |
Booster training (2300-0700) |
Karl |
Limited Injection |
0400-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |