Machine Studies

Schedule for Run03-4, 2008

October 20th 0800 - October 22th 0800



Time

Descriptions

Studiers

SR Status


Monday, 10/20/08



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1000

Switch from RF-2 to RF-3

Horan

No Beam

0900-1000

Swap and revalidate L1 400W amp

Grelick

No Injection

0900-1400

Troubleshoot CPU

Deriy/

Puttkammer


1000-1200

Injector requalification

Ronzhin

No Injection

1200-1400

PC Gun Operation to LEUTL Tunnel

Pasky

No Injection

1200-1600

Optimize PAR RF settings (1200-1400 no PAR beam, 1400-1600 beam needed in PAR)

Grelick

No Injection

1600-2000

FPGA BPM studies

Decker, Bui

Stored beam & injection

2000-2200

Booster training (1500-2300)

Fystro

Limited Injection

2200-2400

Injection study with reference lattice

Emery

Stored beam & inj.


Tuesday, 10/21/08



0000-0200

Injection study with reference lattice

Emery

Stored beam & Inj.

0200-0500

APS Cerenkov detector validation

Yang, Emery

Stored beam & inj.

0500-0800

LCLS beam loss monitor prototype study

Yang, Dooling

Stored beam & Inj.

0800-0900

Linac Training

Thomas, Pasky

Limited Injection

0900-1300

Thermal analysis validation studies (324 singlets)

Capatino

Stored beam

0900-1100

Linac RG1 studies

Pasky

Occasional Injection

1100-1300

Booster training (0700-1500)

Karl

Limited Injection

1000-1100

Remove defunct oscilloscope

Grelick

No Impact

1100-1500

Update RF read-back amplitude calibrations in L3

Grelick

No Impact

1300-1500

Set up PAR tuner feedfoward & bunch cleaning

Yao

Stored beam

1500-2100

P0 feedback

Yao, DiMonte

Stored beam & inj.

2100-2400

Xbpm scans

Decker

Stored beam & inj.


Wednesday, 10/22/08



2400-0100

Xbpm scans

Decker

Stored beam & inj.

0100-0500

300 MeV booster tuneup studies

Sereno

Stored beam, occ. inj.

0300-0700

Measure local chromaticity

Sajaev

Stored beam, Occ. Inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection