Machine Studies

Schedule for Run03-8, 2008

November 18th 0800 – November 19th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 11/18/08



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1100

Investigate possible problem with S2 Raw P.S. # 2

Benes

No beam

0900-0930

Clean VXI backplane connector at Harmonic PAR Envelope Detector #1

Yoder

No beam

0900-0930

Renormalize the SR RF back-up source connections

Berenc

No impact

0900-0930

Switch from RF-3 to RF-2

Horan

No injection

0900-1100

Investigate S12A:P0

Sun

No beam

0900-0930

Verify attenuator values and phase detector input switch wiring

Horan

No Beam

0930-1130

Replace fans in IOCRF4HVPS

Benes

No beam

0930-1030

Swap signal cables on xbpm 21IDP1

Hahne

Access Zone C

0930-1130

Booster qualification test

Fystro

No Injection

1130-1330

Linac training (09-1500)

Thomas

Limited injection

1130-1330

Calibrate feedback system gain (need S36 pinger)

Yao

Stored beam

1330-1600

Test feedback system filter

Yao, DiMonte

Stored beam & inj.

1500-1600

BTS Response Matrix measurement

Emery

Occ. inj.

1600-1900

CPU transient correction

Emery

Stored beam

1600-1700

Set-up PAR Reference files

Yao

Occ. injection

1900-2200

SR DCCT studies, hybrid fill needed

Decker

Stored beam & top-up

2200-2400

Lattice change and orbit recovery

Decker

Stored beam & top-up


Wednesday, 11/19/08



0000-0300

Lattice change and orbit recovery

Decker

Stored beam & top-up

0300-0600

Correct RHB beta functions

Sajaev, Xiao

Stored beam & occ. inj.

0400-0600

Booster training (2300-0700)

Karl

Limited Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection