Machine Studies
Schedule for Run03-9, 2008
November 27th 0000 – November 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, 11/27/08 |
|
|
0000-0010 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0010-0200 |
PAR/Booster requalification |
Grodecki |
No Injection |
0200-0400 |
Experiment with different approaches to reduce transient in PEM steering when running default XRDP |
Emery |
Stored beam & injection |
0400-0730 |
OPEN |
|
|
0730-0930 |
(0700-1500) PAR/Booster requalification |
Flood |
No Injection |
0930-1000 |
Insert a trigger card in S3BPM crate |
Yao |
No impact |
1000-1400 |
P0 feedback test |
Yao |
Occasional Inj. |
1400-1800 |
Simulation benchmarking studies |
Borland |
Occasional Inj. |
1800-2000 |
(1500-2300) PAR/Booster requalification |
Forth |
No Injection |
2000-2200 |
Swap-out S34B:S3 power supply |
OPS |
No beam |
2200-2400 |
Study alternate hybrid mode (1+3x7) lifetime, top-up, top-up interval, and varying 3x7 timing |
Harkay |
Stored beam & Injection |
|
Friday, 11/28/08 |
|
|
0000-0400 |
Study alternate hybrid mode (1+3x7) lifetime, top-up, top-up interval, and varying 3x7 timing |
Harkay |
Stored beam & injection |
0400-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |