Machine Studies
Schedule for Run01-11, 2009
April 7th 0800 – April 8th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 4/7/09 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
MSB and LSB tests on S36A:H2:PS |
Fors |
No beam |
0900-1100 |
Thermal scan Zone B & C PS |
Puttkammer |
No Beam |
0900-1230 |
Measure fundamental-frequency coupling on the SR cavity HOM pickup lines. |
Berenc/ Harkay |
No Beam |
0930-1000 |
6-ID PSS End-to-End Test |
Hawkins |
No beam |
0930-1130 |
Resolve 8-ID Safety Shutter No Switch Faults |
SI Group |
Access Zone A |
0930-1130 |
Install cables between S2 and S4, S3 and S4 for P0 feedback work |
Gold/Yao |
No beam |
0930-1130 |
Swap out thyratron trigger boards P4EK |
PS group |
Access PAR |
0930-1000 |
Check for water leaks in Linac/PAR |
Theres, Bechtold |
Access Linac/ PAR |
1130-1200 |
Recover Linac |
OPS |
No beam |
1200-1330 |
Injector training (09-15) |
Weyer |
Limited injection |
1230-1330 |
Test bunch current monitor |
Yao/Lenkszus |
Stored beam |
1330-1500 |
SR training (09-15) |
Karl |
Stored Beam & Injection |
1500-1800 |
Transverse instability studies using FPGA and VSA, 24 singlets, top-up |
Harkay, Yao |
Stored beam & injection |
1800-2000 |
Set-up hybrid lattice for P0 feedback studies |
Sajaev |
Stored beam & injection |
1800-2000 |
Set-up P0 feedback for hybrid measurements (parasitic to setting up hybrid lattice |
Yao |
Parasitic |
2000-2200 |
Make measurement with chromaticity scan |
Sajaev, Yao |
Stored beam & injection |
2200-2300 |
Remove 2-sector bump to steer 19-ID closer to desired orbit |
Sajaev |
Stored beam |
2300-2400 |
BPLD occurrence study |
Sajaev |
Stored beam & injection |
|
Wednesday, 4/8/09 |
|
|
0000-0200 |
Restore and measure optics for RHB lattice |
Sajaev |
Stored beam & injection |
0200-0500 |
CPU multipole center measurements |
Xiao |
Stored beam |
0500-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |