Schedule for Run01-2, 2009

February 3rd 0800 - February 4th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 2/3/09



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1100

SR training

Fystro

No Beam training

0900-0930

Reboot CPU ioc

Smith

No Beam

0900-0930

Reboot s38 bpm iocs

Norum/Ops

No Beam

0900-1000

Switch to RF1/RF2 / Investigate AGC feedback -problem

Horan

No Beam 0900-0930

0900-1100

Investigate magnet temperature readbacks for 31ah3 and 31bv2

Fors

No Beam

0900-1100

CPU hardware changes

Deriy

No Beam

1100-1130

Inject beam into SR.

SR

Stored Beam & Injection

1130-1200

Investigate AGC feedback control.

Horan

Stored Beam & Injection

1200-1430

Test CPU scripts.

Xiao

Stored Beam & Injection

1200-1430

Linac beam studies (parallel to CPU tests).

Pasky

Occasional injection

1200-1400

Investigate 90 Hz beam noise (parallel to CPU tests).

Horan


1430-1500

Switch to RF3/RF4

Horan

No beam

1500-2100

CPU correction.

Xiao Emery

Stored Beam & Injection

1500-1900

PTB and booster controllaw study (parallel to CPU correction).

Sereno

Occasional injection

1900-2100

Linac training (parallel to CPU correction).

Thomas

Occasional injection

2100-2400

P0 feedback study.

Yao Sajaev

Stored Beam & Injection


Wednesday, 2/4/09



0000-0100

P0 feedback study (continued).

Yao Sajaev

Stored Beam & Injection

0100-0300

Reference lattice response matrix measurements.

Sajaev

Stored Beam & Injection

0300-0500

Correct beta functions.

Sajaev

Stored Beam & Injection

0500-0700

OPEN



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection