Machine Studies

Schedule for Run01-3, 2009

February 9th 0800 - February 11th 0800



Time

Descriptions

Studiers

SR Status


Monday, 2/09/09



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1000

Change attenuator in L1

Grelick

No Injection

0900-1100

investigation of bad magnet temperature readbacks in 31ah3 and 31bv2

Fors

No Beam

0900-1100

investigate cmpsi setpoint data in S35 and S36 correctors

PS group

No Beam

0900-1000

Test S6 stripline.

Yao Gold Chae

No beam

0900-0930

Reboot ID control IOC.

Smith

No beam

0930-1030

Repair LTL limit switch

Hogrefe

Access Linac

0930-1130

Remove bakeout equipment

Gagliano

Access Linac

0930-1130

Repair strobes on PAR and Booster septums

Puttkammer

No Injection

1130-1200

Recover injector systems

Ops

Stored Beam & Injection

1200-1800

CPU AC correction.

Emery Xiao

Stored Beam & Injection

1200-1600

Linac studies. Parallel to CPU correction.

Pasky

Limited Injection

1600-1800

Linac training. Parallel to CPU correction.

Weyer

Limited Injection

1800-2000

SR training.

Karl

Stored Beam & Injection

2000-2400

8LSS lattice study.

Borland

Stored Beam & Injection


Tuesday, 2/10/08



0000-0600

35ID beam stability study.

Decker Yang

Stored Beam & Injection

0000-0200

Linac training. Parallel to 35ID stability study.

Thomas

Limited Injection

0600-1000

Test FPGA-based SR tune measurement system.

Yao Norum

Stored Beam & Injection

0600-1000

Beam loss study in BTX. Parallel to tune measurement study.

Dooling Yang

Limited Injection

1000-1400

RF noise investigation.

RF group

Stored Beam & Injection

1400-1500

Troubleshoot steering PEM.

Schroeder Shang

Stored Beam & Injection

1500-1900

8LSS lattice study.

Borland

Stored Beam & Injection

1500-1700

Linac training. Parallel to 8LSS study.

Weyer

Limited Injection

1900-2100

SR training.

Karl

Stored Beam & Injection

2100-2400

P0 feedback test.

Yao Sajaev

Stored Beam & Injection


Wednesday, 2/11/08



0000-0100

P0 feedback study (continued).

Yao Sajaev

Stored Beam & Injection

0100-0300

Reference lattice measurements.

Sajaev

Stored Beam & Injection

0100-0300

Linac training. Parallel to reference lattice.

Thomas

Limited injection

0300-0700

Xbpm alignment.

Decker Hahne

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection