Machine Studies

Schedule for Run01-4, 2009

February 17th 0800 - February 18th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 2/17/09



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-0930

Reboot interleaving PS DSPs

PS Group/Ops

No Injection

0900-0930

Reboot S38 bpm iocs

Bui

No Beam

0900-1000

Troubleshoot S:IS1 OV trip

PS group

No Injection

0900-1000

Investigate SR Raw T3

PS group

No Beam

0900-1000

Investigate Booster correctors

Puttkammer

No Injection

0900-1030

Modify P0 generator in iocmtime

Lenkszus

No Beam

0930-1000

PSS End to End Test 7BM

Forrestal

No Beam

0930-1030

Inspect & correct striplines

Yao, Gold

Access Zone A

1030-1100

Recover SR systems

Ops

Stored Beam & Injection

1100-1700

CPU AC correction.

Xiao Emery

Stored Beam & Injection

1100-1300

Linac training. Parallel to CPU correction.

Thomas

Limited Injection

1300-1500

Linac beam study. Parallel to CPU correction.

Pasky.

Limited Injection

1500-1600

Test linac trajectory controllaw. Parallel to CPU correction.

Sereno

Limited Injection

1600-1700

Test loss monitor in BTX. Parallel to CPU correction.

Dooling Sajaev

Limited Injection

1700-1900

SR qualification.

Fystro

Stored Beam & Injection

1900-2100

Bunch-by-bunch tune measurements.

Chae

Stored Beam & Injection

2100-2400

P0 feedback study.

Yao Sajaev

Stored Beam & Injection


Wednesday, 2/18/09



0000-0100

P0 feedback study (continued).

Yao Sajaev

Stored Beam & Injection

0100-0300

Prepare hybrid mode.

Sajaev

Stored Beam & Injection

0300-0500

Reference lattice measurement.

Sajaev

Stored Beam & Injection

0300-0500

Linac training. Parallel to reference lattice measurement.

Weyer

Limited Injection

0500-0700

SR training.

Karl

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection