Machine Studies

Schedule for Run01-5, 2009

February 23th 0800 - February 25th 0800



Time

Descriptions

Studiers

SR Status


Monday, 2/23/09



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1100

Study booster ramp waveform corruption problem


Xu

No SR Injection

0900-1000

Add timing signal from iocinjtime to A015

Laird

No Beam

0930-1030

Switch from RF3 to RF2

RF Group

No Beam

0930-1100

Investigate DAS DSP to Main DSP errors

Lenkszus

No Beam

0930-1130

Investigate window water flows

RF group

Access Linac

0930-1330

Repair pnuematic actuator on S39VV01

Gagliano

Access Zone F

1000-1030

Check cable installation route for S35 stripline

Yao, Gold

Access Zone E

0900-1100

Investigate and fix P4EK power supply.

PS group

No beam past PAR

0900-1200

CPU corrector tests.

Smith Deriy

No SR beam

1130-1230

Linac training.

Thomas

Limited Injection

1230-1330

Linac training.

Weyer

Limited Injection

1330-1500

Recover SR beam and SR training.

OPS Karl

Stored Beam & Injection

1500-1700

Test orbit switching PEM.

Sajaev Shang

Stored Beam & Injection

1700-1900

Setup hybrid mode.

Sajaev/Harkay

Stored Beam & Injection

1900-2300

CPU AC correction.

Xiao

Stored Beam & Injection

1900-2000

Setup and test PAR operation. Parallel to CPU correction.

Yao

No injection.

2300-2400

Orbit switch from 24 singlets to hybrid.

Decker Sajaev

Stored Beam & Injection


Tuesday, 2/24/09



0000-0300

Orbit switching (continued).

Decker Sajaev

Stored Beam & Injection

0300-0700

BPM calibration studies at S35.

Decker Yang

Stored Beam & Injection

0700-0900

SR training.

Karl

Stored Beam & Injection

0900-1300

CPU AC correction.

Xiao

Stored Beam & Injection

0900-1100

Linac training. Parallel to CPU correction.

Weyer

Limited Injection

1100-1300

Linac training. Parallel to CPU correction.

Thomas

Limited Injection

1300-1500

Setup S36A:H1 and S36A:H2 dummy loads.

PS group

No SR beam

1300-1500

Linac beam studies.

Pasky

Limited injection

1500-1800

Test SR FPGA based tune measurement system.

Yao Norum

Stored Beam & Injection

1800-2200

P0 feedback studies.

Yao Sajaev

Stored Beam & Injection

2200-2400

Bunch by bunch tune measurements.

Chae Yao Harkay

Stored Beam & Injection


Wednesday, 2/25/09



0000-0200

Bunch by bunch tune measurements (continued).

Chae Yao Harkay

Stored Beam & Injection

0200-0630

Study of bunch patterns for future 200 mA test.

Harkay

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection