Machine Studies

Draft Schedule for Run01-6, 2009

March 3rd 0800 – March 4th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 3/3/09



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1030

Study booster ramp waveform corruption problem

Xu

No Injection

0900-1100

Work on LLRF VXI crates

Horan

Stored Beam & Injection /No Beam (TBD at 09:00)

0915-11:30

Investigate problems with S22B:P0

Xiang, Erwin, Lill

No beam

0915-1015

Remove S36A:H1 and S36A:H2 P.S. from dummy loads and connect to magnets

P.S. Group

No beam

0915-1015

Replace differential pressure transmitter for 16ID-PS1

Swetin

No Beam

0915-1030

Investigate and correct DAS DSP to Main DSP communication errors

Lenkszus

No Beam

0930-1030

Reconfigure S2 drive striplines

Yao, Gold

Access Zone A

0930-1130

Troubleshoot RG2

PS Group

Access Linac

1000-1200

Investigate slow reconnections through the PV gateway (will restart gateway several times)

Arnold

No impact

1030-1100

Replace the DG535 that generates PAR extraction kicker discharge triggers. iocinjtime may be rebooted.

Lenkszus

No beam

1130-1200

Recovery from accesses

OPS

No beam

1200-1330

SR training (0900-1500)

Karl

Stored Beam & Injection

1330-1500

PAR training (0900-1500)

Weyer

Limited Injection (not concurrent with SR training)

1400-1500

Investigate behavior of S36A:H1&:H2 during S35 steering

Sajaev

Stored beam

1500-1700

Test FPGA-based tune system

Yao, Norum

Stored beam

1700-2100

Test P0 Feedback, singlet and 24 singlet fill

Yao, Sajaev

Stored beam & inj.

2100-2400

CPU Coupling Check

Xiao

Stored beam


Wednesday, 3/4/09



0000-0400

Hard X-ray BPM studies

Decker, Yang

Stored beam & injection

0400-0600

Broadband RF BPM studies fill dependent studies

Decker

Stored beam & inj.

0600-0700

Connect S36A:H1 and S36A:H2 to dummy loads

P.S. Group

No beam

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection