Draft Schedule for Run01-6, 2009
March 3rd 0800 – March 4th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, 3/3/09 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1030 |
Study booster ramp waveform corruption problem |
Xu |
No Injection |
0900-1100 |
Work on LLRF VXI crates |
Horan |
Stored Beam & Injection /No Beam (TBD at 09:00) |
0915-11:30 |
Investigate problems with S22B:P0 |
Xiang, Erwin, Lill |
No beam |
0915-1015 |
Remove S36A:H1 and S36A:H2 P.S. from dummy loads and connect to magnets |
P.S. Group |
No beam |
0915-1015 |
Replace differential pressure transmitter for 16ID-PS1 |
Swetin |
No Beam |
0915-1030 |
Investigate and correct DAS DSP to Main DSP communication errors |
Lenkszus |
No Beam |
0930-1030 |
Reconfigure S2 drive striplines |
Yao, Gold |
Access Zone A |
0930-1130 |
Troubleshoot RG2 |
PS Group |
Access Linac |
1000-1200 |
Investigate slow reconnections through the PV gateway (will restart gateway several times) |
Arnold |
No impact |
1030-1100 |
Replace the DG535 that generates PAR extraction kicker discharge triggers. iocinjtime may be rebooted. |
Lenkszus |
No beam |
1130-1200 |
Recovery from accesses |
OPS |
No beam |
1200-1330 |
SR training (0900-1500) |
Karl |
Stored Beam & Injection |
1330-1500 |
PAR training (0900-1500) |
Weyer |
Limited Injection (not concurrent with SR training) |
1400-1500 |
Investigate behavior of S36A:H1&:H2 during S35 steering |
Sajaev |
Stored beam |
1500-1700 |
Test FPGA-based tune system |
Yao, Norum |
Stored beam |
1700-2100 |
Test P0 Feedback, singlet and 24 singlet fill |
Yao, Sajaev |
Stored beam & inj. |
2100-2400 |
CPU Coupling Check |
Xiao |
Stored beam |
|
Wednesday, 3/4/09 |
|
|
0000-0400 |
Hard X-ray BPM studies |
Decker, Yang |
Stored beam & injection |
0400-0600 |
Broadband RF BPM studies fill dependent studies |
Decker |
Stored beam & inj. |
0600-0700 |
Connect S36A:H1 and S36A:H2 to dummy loads |
P.S. Group |
No beam |
0700-0800 |
Prepare for User beam |
OPS |