Schedule for Run01-8, 2009

March 17th 0800 – March 18th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 3/17/09



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1030

RTFB studies

Lenkszus

No Beam

0900-1700

AHU studies

Stevens/Doose

No requirements

0900-0930

Install patch cable to connect S3BP5 to hybrids panel on the same rack.

Gold

No impact

0900-0930

Reboot iocs37vp

Xu

No beam

1030-1100

Recover SR beam.

OPS

Stored Beam & Injection

1100-1300

Test chirp+demodulation of tune FPGA box.

Yao

Stored Beam & Injection

1300-1500

Test S3B:P5 signal for tune measurement.

Yao Gold

Stored Beam & Injection

1500-1900

CPU AC correction.

Xiao

Stored Beam & Injection

1500-1700

Injector training. Parallel to CPU correction.

Weyer

Limited Injection

1900-2100

SR training.

Karl

Stored Beam & Injection

2100-2400

Sextupole offset measurements using response matrices.

Sajaev

Stored Beam & Injection


Wednesday, 3/18/09



0000-0200

Sextupole offset measurement (continued).

Sajaev

Stored Beam & Injection

0200-0500

Reference lattice measurements.

Sajaev

Stored Beam & Injection

0500-0700

Injector training.

Thomas

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection