Machine Studies
Schedule for Run01-9, 2009
March 23rd 0800 – March 25th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, 3/23/09 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1030 |
RTFB studies |
Lenkszus |
No Beam |
0900-1000 |
Swap fibers on S36A:H1 and H2 magnets. |
Fors |
No beam |
0900-1000 |
Reboot booster rf iocs iocrf5hvps, iocrf5cavs and iocrf5cavn |
DiMonte |
No beam |
1030-1100 |
Restore beam in SR. |
OPS |
Stored Beam & Injection |
1100-1300 |
23ID cables checkout iwth probable validation. |
Bui |
Stored Beam & Injection |
1100-1300 |
PAR training. Parallel to 23ID work. |
Thomas |
Limited Injection |
1300-1900 |
Switch orbit from 324 to 24 and debug PEM. |
Sajaev Shang |
Stored Beam & Injection |
1900-2200 |
Install and measure new BPM gains. |
Sajaev |
Stored Beam & Injection |
2200-2400 |
S35 bpm calibration studies. |
Decker Yang |
Stored Beam & Injection |
|
Tuesday, 3/24/09 |
|
|
0000-0400 |
S35 bpm calibration studies (continued). |
Decker Yang |
Stored Beam & Injection |
0000-0200 |
Injector training. Parallel to S35 bpm studies. |
Weyer |
Limited Injection |
0040-0600 |
SR training. |
Karl |
Stored Beam & Injection |
0600-1000 |
Finish PC gun laser alignment. |
Sereno |
No injection |
1000-1600 |
CPU correction studies. |
Xiao |
Stored Beam & Injection |
1100-1300 |
PAR training. Parallel to CPU studies. |
Thomas |
Limited Injection |
1600-2000 |
Test PAR tune measurement system. |
Yao Norum |
Limited injection |
2000-2200 |
Setup bunch cleaning. |
Yao |
Limited injection |
2200-2400 |
Local chromaticity measurements. |
Sajaev |
Stored Beam & Injection |
|
Wednesday, 3/25/09 |
|
|
0000-0200 |
Local chromaticity measurements (continued). |
Sajaev |
Stored Beam & Injection |
0000-0200 |
Injector training. Parallel to chromaticity measurements. |
Weyer |
Limited Injection |
0200-0500 |
Reference lattice measurements. |
Sajaev |
Stored Beam & Injection |
0500-0700 |
SR training. |
Karl |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |