Machine Studies

Schedule for Run02-1, 2009

May 20th 0800 – May 27th 0800

Time

Descriptions

Studiers

SR Status


Wednesday 05/20/09



0800-1400

Initial bpm system checkout

Decker

Stored Beam & Occ. Inj.

0800-1000

PAR/Booster training

Thomas

Limited Injection

1000-1200

Linac studies

Pasky

Limited Injection

1200-1400

Restore and set up Booster tune measurement system

Yao

Limited Injection

1400-2000

BPLD Validations

Bui

Stored Beam & Inj.

2000-2400

PEM/script testing

OPS

Stored Beam & Occ. Inj.


Thursday 05/21/09



0000-0200

OPEN



0200-0400

PAR/Booster training

Weyer

Limited Injection

0400-0600

SR training

Karl

Stored Beam & Injection

0600-0800

Set up gain for SR bunch current monitor (24 singlets)

Yao, Lenkszus Gold

Stored beam & injection

0800-1100

Test SR Tune measurement system with BPM signal

Yao, Gold

Stored beam & occ. injection

1100-1200

Bldg. 420 RF Waveguide Switch & RF1 MPS validation

Marty Smith, RF Group,

No beam

1200-1800

XBPM checkout 100 mA top-up

Decker

Stored beam & injection

1800-2400

Orbit recovery 100 mA top-up

Sajaev

Stored beam & injection


Friday 05/22/09



0000-0400

Test new sextupole configuration

Sajaev

Stored beam & inj.

0400-0530

PAR/Booster training

Weyer

Limited Injection

0530-0700

SR training

Karl

Stored Beam & Injection

0700-0800

Bring down equipment for SR Zone F Access and switch to degassifier recirculation

OPS

No beam

0800-1130

Replace RF cavity tuner bellows thermocouples and IR detectors

Morrison, Bromberek

Zone F Access

0800-1200

PSS shutter tests

SI Group

No Beam

0800-1200

Test PAR bunch cleaning with replaced amplifiers

Yao, Gold

No injection

1200-1800

Measure bunch-by-bunch tune for transversely unstable beam, operational bunch patterns

Harkay, Yao, Chae

Stored beam & injection

1800-2200

Pinhole camera, bunch purity monitor recommissioning

Yang

Stored beam & injection

2200-2300

PAR/Booster training

Thomas

Limited Injection

2200-2400

CPU check-up

Xiao

Stored beam & Occ. inj.


Saturday 05/23/09



0000-0400

CPU check-up (continued)

Xiao

Stored beam & occ. injection

0400-0800

OPEN



0800-1200

Measure beam threshold with and without vertical loop

Sajaev, Yao

Stored beam & inj.





1600-2100

OPEN



2100-2300

PAR/Booster training

Thomas

Limited Injection

2300-2400

OPEN




Sunday 05/24/09



0000-0800

OPEN



0800-1400

CPU Check-up

Xiao

Stored beam & Occ. inj.

1400-2100

OPEN



2100-2300

PAR/Booster training

Thomas

Limited Injection

2300-2400

Top-up Operational Check

OPS

Stored beam & inj.


Monday 05/25/09



0000-1200

Top-up Operational Check

OPS


1000-2000

OPEN



2000-2200

PAR/Booster training

Thomas

Limited Injection

2200-2400

Switch orbit to lattice with new sextupole configuration

Sajaev

Stored beam & Injection


Tuesday 05/26/09



0000-0200

Switch orbit to lattice with new sextupole configuration

Sajaev

Stored beam & Injection

0200-0600

Measure and correct beta functions

Sajaev, Xiao

Stored beam & injection

0600-1200

BPM studies, 24 singlets top-up

Decker, Lill

Stored beam & injection

1200-1300

PAR/Booster training

Weyer

Limited injection

1200-1300

Bldg. 420 RF Waveguide switch

RF Group

No beam

1300-1400

SR training

Karl

Stored beam & Inj.

1400-1800

compare different amplitude control modules of PAR harmonic RF system

Yao, Grelick

Limited injection

1400-2000

Measurements of HOM spectra with operational bunch patterns

Harkay, Berenc

Stored beam & Occ. Injection

2000-2400

Bunch pattern study for 200 mA, HOM damper and vertical scraper heating limits; alternate bunch patterns. (will only be using 100mA for this study)

Harkay

Stored beam & inj.


Wednesday 05/27/09



0000-0600

OPEN



0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection