Machine Studies
Schedule for Run02-10, 2009
August 4th 0800 – August 5th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, August 4, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Injector training (09-15) |
Weyer |
Limited Injection |
0900-1000 |
Assess booster dipole power supply |
Puttkammer |
No Injection |
0900-1000 |
Prepare for FPGA switchover |
Bui/Lenkszus |
No Beam |
0930-1030 |
Shift BLM at sector 33 |
Berg |
Access Zone E |
1030-1100 |
Recover from access |
OPS |
Stored beam & injection |
1100-1700 |
S35 monopulse fpga changeover (top-up needed during second half of study) |
Decker, Shang, Bui, et al |
Stored beam & injection |
1700-1900 |
repeat the test of gated integration in the Harmonic PAR AGC and cavity phase loops and verify the ability to return to initial conditions |
Grelick, Berenc, Smith, DiMonte |
Limited Injection |
1700-1900 |
Test S35 drive stripline and amplifier |
Yao |
Stored beam |
1900-2100 |
optimize the PAR setup after Wavetech card replacement |
Yao |
Limited injection |
2100-2400 |
Turn-by-turn measurements |
Sajaev |
Stored beam & inj. |
|
Wednesday, August 5, 2009 |
|
|
0000-0100 |
Turn-by-turn measurements (continued) |
Sajaev |
Stored beam & inj. |
0100-0700 |
OPEN |
|
|
0700-0800 |
Prepare for user Operations |
Ops |
Stored Beam & Injection |