Machine Studies

Schedule for Run02-10, 2009

August 4th 0800 – August 5th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, August 4, 2009



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1100

Injector training (09-15)

Weyer

Limited Injection

0900-1000

Assess booster dipole power supply

Puttkammer

No Injection

0900-1000

Prepare for FPGA switchover

Bui/Lenkszus

No Beam

0930-1030

Shift BLM at sector 33

Berg

Access Zone E

1030-1100

Recover from access

OPS

Stored beam & injection

1100-1700

S35 monopulse fpga changeover (top-up needed during second half of study)

Decker, Shang, Bui, et al

Stored beam & injection

1700-1900

repeat the test of gated integration in the Harmonic PAR AGC and cavity phase loops and verify the ability to return to initial conditions

Grelick, Berenc, Smith, DiMonte

Limited Injection

1700-1900

Test S35 drive stripline and amplifier

Yao

Stored beam

1900-2100

optimize the PAR setup after Wavetech card replacement

Yao

Limited injection

2100-2400

Turn-by-turn measurements

Sajaev

Stored beam & inj.


Wednesday, August 5, 2009



0000-0100

Turn-by-turn measurements (continued)

Sajaev

Stored beam & inj.

0100-0700

OPEN



0700-0800

Prepare for user Operations

Ops

Stored Beam & Injection