August 11th 0800 – August 12th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, August 11, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Thermal images Zone C PS |
Puttkammer |
No Beam |
0900-1100 |
Update external clock RTFB cards |
Sun, Lenkszus |
No Beam |
0900-1100 |
Investigate FBM100 mapping issues |
Grelick |
No Injection |
0930-1200 |
Inspect and configure BLM cable to transmit fast signal from S2 to S35 (small chance Zone E access may be needed) |
Gold, Yao |
Access Zone F & Zone A |
1200-1230 |
Recover from access |
OPS |
Stored beam & injection |
1230-1300 |
Test addition of FPGA BPMs in Transfer BPM errors to setpoints PEM |
Shang/ Schroeder |
Stored beam |
1300-1500 |
Injector training (09-15) |
Weyer |
Limited Injection |
1300-1700 |
Study the influence of external clocks on the ac data at rack 01-04, 05-04 and 25-04 |
Xu/ Lenkszus/ Erwin/ Sun/ Decker |
Stored beam & occ. injection |
1700-2100 |
commission the loss monitor cable connection (singlet needed) |
Yao |
Stored beam |
2100-2400 |
Switch to 324 singlets and recover orbit |
Sajaev |
Stored beam & injection |
|
Wednesday, August 12, 2009 |
|
|
0000-0100 |
Switch to 324 singlets and recover orbit |
Sajaev |
Stored beam & injection |
0100-0630 |
OPEN |
|
|
0630-0800 |
Prepare for user Operations |
Ops |
Stored Beam & Injection |