Machine Studies

Draft Schedule for Run02-2, 2009

June 02nd 0800 - June 03rd 0800



Time

Descriptions

Studiers

SR Status


Tuesday, June 02, 2009



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-0930

Reboot iocbvp2

Lenkszus

No Injection

0900-0930

Replace PAR RF-12 modulator card

Grelick

No Injection

0900-1000

Troubleshoot variable speed drive for P-RF2

Swetin

No injection

0900-0930

Check ACIS-CCTV interface cabling

Forrestal

No Beam

0900-1230

Test new SR Dipole regulator

Puttkammer

No beam

0900-1000

Reboot RF iocs

DiMonte

Stored Beam & Injection

0900-1000

Reboot sioclidiag and ioclic2.

Pietryla

No Injection

0900-1000

Reboot iocpar02 and recalibrate scraper

Stevens

No Injection

0900-1300

RF-2 arc investigation RF-4 T-R repairs

RF group

No Beam/No Injection

1000-1100

Reconfigure PAR bunch clean FPGA input mux.

Yao

No injection

1000-1500

L5 conditioning (Parasitic – will be able to provide constant beam during beginning of study and beam on request toward end)

Pasky

No impact

1200-1330

Injector training (09-15)

Weyer

Limited injection

1300-1700

RF setup (may cancel some or all other studies during this time frame)

RF group

Parasitic to beam studies

1330-1500

SR training (09-15)

Karl

Stored Beam & Injection

1500-1700

SR requalification test

Christensen/ Schroeder

Stored Beam & Injection

1700-2100

P0 feedback study

Yao, Sajaev

Stored beam & injection

2100-2300

Bunch-by-bunch SR Tune measurements

Yao

Stored beam & injection

2300-2400

FPGA BPM testing / PEM testing

Decker

Stored beam & injection


Wednesday, June 03, 2009



0000-0300

FPGA BPM testing / PEM testing

Decker

Stored beam & injection

0300-0700

CPU AC correction

Xiao

Stored beam & Occ. Inj.

0300-0500

Injector training (23-07)

Thomas

Limited injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection