Schedule for Run02-3, 2009

June 9th 0800 - June 10th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, June 09, 2009



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1000

Injector BPM high/low gain tests

Erwin

No Injection

0900-1000

Switchover pumps P-405, P-503, P-535 to standby (power supplies need to be set to 0)

Bracken

No Beam

0900-1000

Verify PAR dipole drawing

Puttkammer

No Injection

0900-1000

DSP reboot for interleaving P.S.

Puttkammer

No injection

0900-1000

Investigate LTP:Q10 P.S.

Puttkammer

No injection

0900-1100

Linac RF conditioning

Pasky

No Injection

0900-1100

Switch from RF-1 to RF-4 and set up RF-4

Horan

No Beam

0900-1100

PAR RF control loop work

RF Group

Limited Injection

0900-1100

Repair/replace Photohelix hose to S38 Cavity Blower

RF Group/ Morrison

Access Zone F

0930-1000

Check BLM PS

Dooling

Access Zone E

1100-1300

PAR training

Thomas

Limited Injection

1200-1400

SR Requalifcation

LaBuda/ Schroeder

Stored beam & occ. injection

1300-1500

Investigate PAR beam stability at high charge

Yao

Limited injection

1400-1500

Check BPM reboot procedure for S38

Bui/Schroeder

Stored beam

1500-1700

SR Requalification

Ronzhin/ Schroeder

Stored beam & occ. injection

1700-2100

Measure growth/damping of P0 feedback system (24 singlets)

Yao

Stored beam & injection

2100-2400

Bunch-by-bunch tune measurement in various fill pattern

Chae, Yao

Stored beam & injection


Wednesday, June 10, 2009



0000-0100

Bunch-by-bunch tune measurement in various fill pattern

Chae, Yao

Stored beam & injection

0100-0400

injection efficiency problem (only 85% in singlets modes) check dynamic aperture, etc.

Emery

Stored beam & injection

0400-0600

SR requalification

Grodecki/ Christensen

Stored beam & injection

0600-0700

OPEN



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection