Machine Studies
Schedule for Run02-3, 2009
June 9th 0800 - June 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 09, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1000 |
Injector BPM high/low gain tests |
Erwin |
No Injection |
0900-1000 |
Switchover pumps P-405, P-503, P-535 to standby (power supplies need to be set to 0) |
Bracken |
No Beam |
0900-1000 |
Verify PAR dipole drawing |
Puttkammer |
No Injection |
0900-1000 |
DSP reboot for interleaving P.S. |
Puttkammer |
No injection |
0900-1000 |
Investigate LTP:Q10 P.S. |
Puttkammer |
No injection |
0900-1100 |
Linac RF conditioning |
Pasky |
No Injection |
0900-1100 |
Switch from RF-1 to RF-4 and set up RF-4 |
Horan |
No Beam |
0900-1100 |
PAR RF control loop work |
RF Group |
Limited Injection |
0900-1100 |
Repair/replace Photohelix hose to S38 Cavity Blower |
RF Group/ Morrison |
Access Zone F |
0930-1000 |
Check BLM PS |
Dooling |
Access Zone E |
1100-1300 |
PAR training |
Thomas |
Limited Injection |
1200-1400 |
SR Requalifcation |
LaBuda/ Schroeder |
Stored beam & occ. injection |
1300-1500 |
Investigate PAR beam stability at high charge |
Yao |
Limited injection |
1400-1500 |
Check BPM reboot procedure for S38 |
Bui/Schroeder |
Stored beam |
1500-1700 |
SR Requalification |
Ronzhin/ Schroeder |
Stored beam & occ. injection |
1700-2100 |
Measure growth/damping of P0 feedback system (24 singlets) |
Yao |
Stored beam & injection |
2100-2400 |
Bunch-by-bunch tune measurement in various fill pattern |
Chae, Yao |
Stored beam & injection |
|
Wednesday, June 10, 2009 |
|
|
0000-0100 |
Bunch-by-bunch tune measurement in various fill pattern |
Chae, Yao |
Stored beam & injection |
0100-0400 |
injection efficiency problem (only 85% in singlets modes) check dynamic aperture, etc. |
Emery |
Stored beam & injection |
0400-0600 |
SR requalification |
Grodecki/ Christensen |
Stored beam & injection |
0600-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |