Machine Studies
Schedule for Run02-5, 2009
June 22th 0800 - June 24th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 22, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0930 |
Reboot ioclet2 |
Erwin |
Limited Injection |
0900-1100 |
Verify PAR dipole interlock board |
Puttkammer |
No Injection |
0900-1100 |
Measure Booster dipole overcurrent trip level |
Puttkammer |
No injection |
0900-1300 |
Investigate RF1, RF3 & RF4 UVC problems |
Horan |
No Beam |
0900-1300 |
Pull fiber cables |
Gold |
No Impact |
0930-1030 |
Replace 30ID linear encoder |
Merritt |
Access Zone E |
1200-1230 |
Test an HP multiplexer in iocpartune |
Stevens/Yao |
No impact |
1300-1700 |
FPGA BPM Configuration |
Decker/Shang/ Sajaev |
Stored beam & Injection |
1700-2300 |
Bunch-by-bunch tune measurement: fast ion instability |
Chae/Yao |
Stored beam & injection |
2300-2400 |
Orbit switch 24 singlets to 324 singlets |
Sajaev/Xiao |
Stored beam & injection |
|
Tuesday, June 23, 2009 |
|
|
0000-0300 |
Orbit switch 24 singlets to 324 singlets |
Sajaev/Xiao |
Stored beam & injection |
0300-0500 |
Injector training (23-07) |
Weyer |
Limited injection |
0500-0800 |
OPEN |
|
|
0800-1200 |
Investigage UVC problems, RF1, RF3, RF4 |
Horan |
No beam |
0800-1000 |
Troubleshoot VFD for pump P-RF2 |
Swetin |
No Beam/ No RF2 |
1000-1200 |
Set-up and test PAR Streak Camera (requires PAR beam) |
Yao, Yang |
Limited injection |
1200-1500 |
Investigation of S6A:P1, BPLD revalidation |
Sun/Bui/ Decker |
Stored beam & injection |
1500-2100 |
Measure damping/growth waveform of P0 feedback |
Yao |
Stored beam & injection |
2100-2400 |
Set up hybrid lattice with new sextupoles |
Sajaev/Xiao |
Stored beam & injection |
|
Wednesday, June 24, 2009 |
|
|
0000-0300 |
Set up hybrid lattice with new sextupoles |
Sajaev/Xiao |
Stored beam & injection |
0300-0430 |
OPEN |
|
|
0430-0630 |
Injector training (23-07) |
Weyer |
Limited injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |