Machine Studies

Schedule for Run02-5, 2009

June 22th 0800 - June 24th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 22, 2009



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-0930

Reboot ioclet2

Erwin

Limited Injection

0900-1100

Verify PAR dipole interlock board

Puttkammer

No Injection

0900-1100

Measure Booster dipole overcurrent trip level

Puttkammer

No injection

0900-1300

Investigate RF1, RF3 & RF4 UVC problems

Horan

No Beam

0900-1300

Pull fiber cables

Gold

No Impact

0930-1030

Replace 30ID linear encoder

Merritt

Access Zone E

1200-1230

Test an HP multiplexer in iocpartune

Stevens/Yao

No impact

1300-1700

FPGA BPM Configuration

Decker/Shang/ Sajaev

Stored beam & Injection

1700-2300

Bunch-by-bunch tune measurement: fast ion instability

Chae/Yao

Stored beam & injection

2300-2400

Orbit switch 24 singlets to 324 singlets

Sajaev/Xiao

Stored beam & injection


Tuesday, June 23, 2009



0000-0300

Orbit switch 24 singlets to 324 singlets

Sajaev/Xiao

Stored beam & injection

0300-0500

Injector training (23-07)

Weyer

Limited injection

0500-0800

OPEN



0800-1200

Investigage UVC problems, RF1, RF3, RF4

Horan

No beam

0800-1000

Troubleshoot VFD for pump P-RF2

Swetin

No Beam/ No RF2

1000-1200

Set-up and test PAR Streak Camera (requires PAR beam)

Yao, Yang

Limited injection

1200-1500

Investigation of S6A:P1, BPLD revalidation

Sun/Bui/ Decker

Stored beam & injection

1500-2100

Measure damping/growth waveform of P0 feedback

Yao

Stored beam & injection

2100-2400

Set up hybrid lattice with new sextupoles

Sajaev/Xiao

Stored beam & injection


Wednesday, June 24, 2009



0000-0300

Set up hybrid lattice with new sextupoles

Sajaev/Xiao

Stored beam & injection

0300-0430

OPEN



0430-0630

Injector training (23-07)

Weyer

Limited injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection