Machine Studies

Schedule for Run02-8, 2009

July 20th 0800 – July 22nd 0800

Time

Descriptions

Studiers

SR Status


Monday, July 20, 2009



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1000

Switch from RF2 to RF3

Grelick

No Beam

0900-1000

Replace RF5 Klystron garage blower

Grelick

No beam

0900-1000

8BM PSS end to end test

Boron

No Beam

0900-1000

Install MFI100 in IOCS35fb

Bui/Lenkzsus

No Beam

0900-0930

reboot IOCLET2BPM 

Erwin


1000-1400

continue injection threshold study with P0 feedback 
Yao

Stored beam & Injection

1400-1500

test chromaticity script

Yao

Stored beam

1500-1700

SR Requalification (1500-2300)

Hill/Schroeder

Stored beam & Occ. Injection

1700-1900

measure S35 stripline/amplifier driving ability

Yao, Sajaev

stored beam and reinjetion

1900-2300

Finish setting up RHB
Sajaev Xiao

Stored beam & Injection

2300-2400

Orbit switch. Sajaev Xiao (after setting up RHB)

Sajaev Xiao

Stored beam & injection


Tuesday, July 21, 2009



0000-0300

Orbit switch. Sajaev Xiao (after setting up RHB) (continued)

Sajaev Xiao

Stored beam & injection

0300-0700

Open



0700-0900

Injector training (0700-1500)

Thomas

Limited injection

0900-1500

Investigation of anomalous Imax trip

Chae, Keane, Yao

Stored beam & injection

1500-1700

Evaluate loop dynamic effects on harmonic PAR transient performance and possible improvements


Grelick, Berenc, Smith, DiMonte

Limited Injection

1500-1700

Test FPGA waveform viewer

Shang Sajaev

Stored beam

1700-2100

New sextupoles for hybrid. 

Sajaev

Stored beam & Injection

2100-2300

Turn-by-turn measurements

Sajaev

Stored beam

2100-2300

Injector Training (1500-2300)

Weyer

Limited Injection

2300-2400

Bunch-by-bunch tune measurement study

Harkay

Stored beam & injection


Wednesday, July 22, 2009



0000-0400

Bunch-by-bunch tune measurement study

Harkay

Stored beam & injection

0400-0630

OPEN



0630-0800

Prepare for user Operations 24 singlets RHB Top-up

Ops

Stored Beam & Injection