Machine Studies

Schedule for Run02-9, 2009

July 28th 0800 – July 29th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, July 28, 2009



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1300

Remove backscatter beamline

Kruy

No Beam

0930-1000

11-ID PSS End-to-End test

Hawkins

No beam

1000-1200

test the use of gated integration which is enabled during the PAR RF pulse and disabled between pulses

Grelick, Berenc, Smith, DiMonte

Limited Injection

1200-1300

Test DSP code

Lenkszus

No Beam

1300-1400

Shielding verification after removal of backscatter beamline

Vacca

Stored beam

1400-1700

FPGA software testing

Decker/Shang

Stored beam & Occ. injection

1500-1700

Test Par bunch length measurement application

Yao

Limited injection

1700-2100

Test current threshold with feedback (24 singlet fill)

Yao

Stored beam & injection

2100-2300

Storage Ring requalification

Flood, S.

Stored beam & injection

2300-2400

Punch down ID4 correctors

Sajaev

Stored beam & Injection


Wednesday, July 29, 2009



0000-0500

setup 24 singlets with old quads and new sextupoles

Sajaev

Stored beam & injection

0500-0700

Injector training (23-07)

Weyer

Limited Injection

0700-0800

Prepare for user Operations

Ops

Stored Beam & Injection