Machine Studies
Schedule for Run03-10, 2009
December 8th 0800 - December 9th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, December 08, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0930-1030 |
Install radiation detectors on the SR thick septum in S39 |
Dooling |
Access Zone F |
1030-1100 |
Recover SR systems |
Ops |
Stored Beam & Injection |
1100-1300 |
SR training. |
Weyer |
Stored Beam & Injection |
1300-1700 |
BPM studies. |
Decker |
Stored Beam & Injection |
1300-1500 |
BTX radiation monitor studies. Parallel to BPM studies. |
Dooling |
Beam in BTS |
1500-1700 |
Verify topup scripts. Parallel to BPM studies. |
Sereno |
Stored Beam & Injection |
1700-1900 |
Test vertical corrector punchdown. |
Yao |
Stored Beam & Injection |
1900-2100 |
P0 feedback test with RHB lattice. |
Yao |
Stored Beam & Injection |
2100-2400 |
Setup hybrid lattice. |
Xiao Sajaev |
Stored Beam & Injection |
|
Wednesday, December 09, 2009 |
|
|
0000-0100 |
Setup hybrid lattice (continued). |
Xiao Sajaev |
Stored Beam & Injection |
0100-0500 |
Switch orbit to hybrid lattice. |
Xiao Sajaev |
Stored Beam & Injection |
0500-0700 |
SR training. |
Thomas |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |