Machine Studies
Schedule for Run03-2, 2009
October 13th 0800 - October 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, October 13, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0900-0930 |
Reboot interleaving PS DSP's |
PS Group |
No Injection |
0900-0930 |
Reboot iocs35bpm |
Smith |
No Beam |
0900-1100 |
Investigate RF4 SCR AC O.I trip |
Bromberek |
No Beam |
0900-0930 |
Replace ground fault resistor in B:BM |
Puttkammer |
No Injection |
0930-1030 |
Replace Sector 13 Cherenkov detector |
Yang |
Access Zone B |
0930-1100 |
Verify replace Chain B block I/O in the Sector 11 ASIE |
Hogrefe |
Access Zone B |
0930-1130 |
Booster console qualification test |
Thomas |
No Injection |
1000-1030 |
Verify PMT power suply |
Dooling |
Access Zone E |
1030-1130 |
Investigate ACF100 boards at RF2 & 4 |
Horan |
No Beam |
1130-1200 |
Recover SR systems |
Ops |
Stored Beam & Injection |
1200-1400 |
Linac beam studies. |
Pasky |
Limited injection |
1400-1600 |
Calibrate PAR RF gap voltage. |
Yao |
Limited injection |
1600-1800 |
Test P0 feedback. |
Yao |
Stored beam & injection |
1800-2200 |
Steering software tests. |
Emery Sajaev |
Stored beam & injection |
2200-2400 |
Punch down A:H3 correctors. |
Sajaev |
Stored beam & injection |
|
Wednesday, October 14, 2009 |
|
|
0000-0400 |
BPM studies. |
Decker |
Stored beam & injection |
0400-0600 |
OPEN |
|
|
0600-0700 |
Replace ground fault resistor in B:BM |
Puttkammer |
No Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |