Machine Studies
Draft Schedule for Run03-9, 2009
December 1st 0800 - December 2nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, December 01, 2009 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0900-0930 |
Reboot interleaving DSP's |
Fors |
No Injection |
0900-0930 |
Reboot iocs37vp iocs39vp
|
Xu |
No Beam |
0900-0930 |
Switch K3 to Injector Test Stand |
OPS |
No Injection |
0930-1100 |
Repair LTP:Q10:PS |
Hillman |
No injection |
0930-1030 |
Move BLM shielding |
Erwin |
Access Zone E |
0930-1130 |
Repair water leak in sector 15 cabinet 4 |
Puttkammer |
No Beam |
0900-1300 |
Shutdown RP-X4-7 (takes down PW to 29-30 and 26-27 beamlines)
|
Stevens |
No Beam |
1300-1700 |
Measure feedback damping time, 24 singlet pattern |
Yao |
Stored Beam & Injection |
1700-1900 |
SR training (15-23) |
Thomas |
Stored Beam & Injection |
1900-2400 |
BPM studies |
Decker |
Stored Beam & Injection |
|
Wednesday, December 02, 2009 |
|
|
0000-0300 |
BPM studies |
Decker |
Stored Beam & Injection |
0300-0500 |
SR training (23-07) |
Weyer |
Stored Beam & Injection |
0500-0530 |
Switch K3 to WL (normal K3 down mode) |
OPS |
No injection |
0530-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |