Machine Studies
Schedule for Run01-10, 2010
April 6th 0800 – April 7th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, April 06, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0909 |
Gap Scans and update IDGapFF look-up tables, restore gaps to User Operations |
Schroeder |
Stored Beam & injection |
0909-0910 |
Take tune measurement |
OPS |
Stored beam |
0910-1000 |
Connect scope to measure noise which may be causing Kly Out Arc trips |
RF Group |
No beam |
0910-1000 |
relocate prototype Beam Loss Monitor at 33ID chamber |
Erwin/Brill |
Zone E Access |
0910-1100 |
Investigate IOCRFsource reboot problem without beam |
DiMonte/RF Group/OPS |
No beam |
0910-1030 |
NRTL inspections on SR Dipole |
Puttkammer |
No beam |
0910-1100 |
Replacement of the Spectrum Analyzer in Rack 5 of RF2 |
Epperson |
No beam |
0910-1030 |
swap out and test L3:AM1, PTB:Q1, PTB:Q6 and PTB:Q10 |
Puttkammer |
No beam |
1030-1100 |
Recover injectors, standardize entire ring, fill & take tune measurement |
OPS |
Stored beam & injection |
1100-1200 |
Investigate IOCRFsource reboot problem with beam |
DiMonte/RF Group/OPS |
Stored beam & injection |
1200-1400 |
Linac/Par beam studies to verify Sys.Ref files |
Pasky |
Stored beam & limited injection |
1400-1700 |
Study the suspected HOM-driven longitudinal instability (324s, 100 mA, intermittent injection) |
Harkay |
Stored beam & injection |
1500-1700 |
Investigate Booster Injection |
Yao |
Injection available |
1700-1900 |
optimize bunch purity with 350 MeV injector beam. Requires 24 singlets fill in the SR and bunch purity measurement. |
Yao/T. Smith |
Stored beam & injection |
1900-2300 |
P0 feedback with 8mA per bunch |
Yao |
Stored beam & injection |
2300-2400 |
Set up new RHB lattice S23 |
Xiao, Sajaev |
Stored beam & injection |
|
Wednesday, April 07, 2010 |
|
|
0000-0700 |
Set up new RHB lattice S23 |
Xiao, Sajaev |
Stored Beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |