Machine Studies
Schedule for Run01-5, 2010
March 1st 0800 – March 3rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 01, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-0930 |
Waveguide switch to RF3/RF4 |
Horan |
No Beam |
0900-1000 |
investigate quad control issues (requires all quadupoles on) |
Sajaev/Fors/ Xu |
No beam |
0900-1100 |
Install waveguide blanking plate at waveguide flange TL27 |
Horan |
No Beam |
0900-1100 |
Test noise issues with BEK |
Puttkammer |
No Injection |
0900-1100 |
Troubleshoot Booster Dipole notch filter |
Feng |
No Injection |
0900-1100 |
Troubleshoot S:BM 6Gev I dropouts |
Puttkammer |
No Beam |
1000-1100 |
Investigate SR Raw 4:5 T2 blown crowbar fuse |
Puttkammer |
No beam |
1000-1100 |
Test PAR chromaticity measurement script (SR Freq. will be changed) |
Yao/Shang |
No SR beam |
1100-1200 |
Storage-ring Training |
Pasky/ Schroeder |
Stored beam & inj. |
1200-1400 |
Setup hybrid lattice |
Xiao |
Stored beam & injection |
1400-1800 |
Switch from 24 singlets to hybrid |
Xiao |
Stored beam & inj. |
1800-2200 |
P0 feedback with 12x8mA |
Yao |
Stored beam & inj. |
2200-2400 |
Continue small dynamic aperture study |
Sajaev/Emery (remotely) |
Stored beam & inj. |
|
Tuesday, March 02, 2010 |
|
|
0000-0200 |
Continue small dynamic aperture study |
Sajaev/Emery (remotely) |
Stored beam & inj. |
0200-0600 |
Continue testing 8LSS. |
Sajaev |
Stored beam & inj. |
0600-1100 |
S4 Cherenkov detector studies |
Yang |
Stored beam & inj. |
1100-1500 |
Continue fine tune of CPU AC mode |
Xiao |
Stored beam |
1100-1500 |
High charge injector study (beam through the Booster) |
Yao, Yang |
Limited injection |
1500-2300 |
1+3x7 fill for 32-ID -- Top-up (requires shutters open) (1 hour closed shutters sometime in the middle while fuel injectors are switched) |
32-ID |
Stored beam & injection |
2300-2400 |
Test various new sextupole settings |
Sajaev |
Stored beam & inj. |
|
Wednesday, March 03, 2010 |
|
|
2400-0300 |
Test various new sextupole settings |
Sajaev |
Stored beam & inj. |
0300-0630 |
Test single sextupole correction |
Sajaev |
Stored beam & inj. |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |