Machine Studies
Draft Schedule for Run03-1, 2010
September 28th 0800 – October 5th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
(Pre-Studies) Monday, September 27, 2010 |
|
|
0900-1000 |
Set-up to store initial beam, MPS validation with beam |
|
|
1000-2400 |
RF condition with beam to 115mA |
OPS |
Stored beam & injection |
1600-2000 |
Initial pinhole camera setup >50mA (parasitic) |
Yang |
Stored beam |
|
Tuesday, September 28, 2010 |
|
|
0000-0800 |
SR conditioning with Beam |
|
|
0800-1200 |
BPLD validations (change MPS to 105mA before start) |
Bui |
Stored beam & inj. |
1200-1600 |
Initial XBPM checkout |
Hahne |
Stored beam & occ. inj. |
1200-1400 |
Check BESOCM noise from PAR septum |
Yao, Donley |
Occ. injection possible |
1400-1800 |
Test Booster BM ramps |
Yao |
Occ. injection possible |
1800-2400 |
OPEN |
|
|
|
Wednesday, September 29, 2010 |
|
|
0000-0600 |
OPEN |
|
|
0600-1200 |
Initial BPM checkout |
Decker, Bui |
Stored beam & inj. |
1200-1800 |
S35 digial camera studies |
Yang |
Stored beam |
1200-1300 |
Linac training |
Schewe, Pasky |
Limited injection |
1300-1700 |
Test Soft current regulation on Booster BM |
Yao, Wang, Shang |
No injection |
1800-2200 |
Initial Orbit recovery |
Xiao |
Stored beam & inj. |
2200-2400 |
Correct beta functions for 24 singlets |
Sajaev |
Stored beam & inj. |
|
Thursday, September 30, 2010 |
|
|
0000-0200 |
Initial Orbit recovery |
Sajaev/Xiao |
Stored beam & inj. |
0200-0600 |
OPEN |
|
|
0600-0800 |
Test changes to iocsrmon |
DiMonte |
No beam |
0630-7:45 |
Troubleshoot a problem with starting pump 301 (P.S. and RF off) |
Wright |
No injection |
0800-1200 |
Initial 29 Rogue Microwave studies |
Decker, Lill |
Stored beam & inj. |
1200-1300 |
13-ID-C survey with 100mA (shutter permit needed) |
Wyncott, Vacca |
Stored beam |
1300-1700 |
Test P0 feedback PEM and test system |
Yao |
Stored beam & inj. |
1700-1900 |
Linac training (15:00-23:00) |
Schewe |
Limited injection |
1900-2400 |
CPU Check-up |
Xiao |
Stored beam & inj. |
|
Friday, October 01, 2010 |
|
|
0000-0100 |
CPU Check-up |
Xiao |
Stored beam & inj. |
0100-0800 |
OPEN |
|
|
0800-1000 |
Check Chain C summation signal for Zones A and F.
|
Forrestal |
No Beam |
0800-1000 |
Measure CMPSI setpoint timing and polarity at S10A:H1 |
Fors |
No beam |
0800-1000 |
Replace damaged converter P2 cables in zone B |
P.S. Group |
No beam |
0800-0830 |
Prepare for Zone A & Zone F access |
OPS |
No beam |
0830-0930 |
Install lead shield and BLM detector at 5-ID BLM test area |
Erwin/Yang |
Access Zone A |
0800-1200 |
RFG kicker validation |
Shang |
No Injection |
0800-1200 |
PSS shutter checkouts |
SI group |
No Beam |
0800-1200 |
Study Booster Dipole I & V ripple |
Feng |
Booster Access |
0900-1100 |
Replace camera at BTS:FS5 |
Dombrowski/ Berg |
Access Zone F |
1200-1800 |
Final BPM system check-out (Top-up) |
Decker |
Stored beam & inj. |
1800-2000 |
OPEN |
|
|
2000-2400 |
Test new CPU software |
Xiao |
Stored beam & inj. |
|
Saturday, October 02, 2010 |
|
|
000-0400 |
setup hybrid (return to standard 24 singlets after study) |
Xiao |
Stored beam & inj. |
0400-2000 |
OPEN |
|
|
2000-2400 |
Operational Top-UP check |
OPS |
Stored beam & inj. |
|
Sunday, October 03, 2010 |
|
|
2400-0800 |
Operational Top-up check |
OPS |
Stored beam & inj. |
0800-2200 |
open |
|
|
2200-2400 |
Optimize injection and measure model |
Sajaev |
Stored beam & injection |
|
Monday, October 04, 2010 |
|
|
0000-0200 |
Optimize injection and measure model |
Sajaev |
Stored beam & inj. |
0200-0600 |
Continue testing APS lattice upgrade |
Sajaev |
Stored beam & inj. |
0600-1000 |
repairs to Booster Pump contactor P- 301 |
MOM Group |
No injection |
0830-0900 |
IOCsrmon reboot |
DiMonte |
No impact |
1000-1400 |
S29 Rogue Microwave studies |
Lill |
Stored beam & inj. |
1400-1600 |
ID gap scans (top-up needed) |
Schroeder |
Stored beam & inj. |
1600-1700 |
Position the UC/HEP circuit board |
Dooling/HP |
Access Zone F |
1700-2300 |
Final S35 setup |
Yang |
Stored beam & inj. |
2300-2400 |
Setup RHB |
Xiao, Sajaev |
Stored beam & inj |
|
Tuesday, October 05, 2010 |
|
|
0000-0230 |
Setup RHB |
Xiao, Sajaev |
Stored beam & inj |
0230-0630 |
Test failed sextupole correction |
Sajaev |
Stored beam & inj. |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |