Machine Studies
Draft Schedule for Run03-4, 2010
October 26th 0800 - October 27th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 25, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0900-0930 |
Remove phase shifter board from RF1 |
RF group |
Stored Beam |
0900-1100 |
Measure B:BM ouput voltage |
Feng |
No Injection |
0900-1200 |
Troubleshoot PAR RF-1 |
RF group |
Limited Injection |
0900-1200 |
Replace leaking RF5 mod-anode oil pump |
RF group |
No Injection |
0930-1130 |
Investigate inconsistent S12C:BM:PS voltage and current readbacks |
Fors |
No Beam |
0930-1000 |
Waveguide switch to RF3 |
RF group |
No Beam |
0930-1130 |
Fix iocmps Event Receiver problem |
Laird |
No Beam |
1000-1100 |
Switch rebuilt pumps P-505, P-525, P-531 to lead pump operation. (all affected P.S. set to 0 - WR#. 28008) |
Bracken |
No beam |
1200-1400 |
Linac training (09-15) |
Schewe |
Limited Injection |
1200-1400 |
Test Restore normal chromaticity PEM and 12-ID Canted undulator steering |
Schroeder |
Stored beam |
1400-1600 |
investigate the monopulse bsp-100 absence of MPS dump trigger |
Decker/Bui |
Stored beam & inj. |
1600-1800 |
Investigate reboot issues with RF IOCs |
DiMonte |
Stored beam & inj. |
1800-2100 |
test smooth ramp for booster magnet supplies |
Yao |
Limited injection |
2100-2400 |
Set-up hybrid |
Sajaev, Xiao |
Stored beam & inj. |
|
Tuesday, October 26, 2010 |
|
|
0000-0400 |
Switch orbit |
Xiao |
Stored beam & inj. |
0400-0700 |
OPEN |
|
|
0700-0900 |
Linac training (07-15) |
Schewe |
Limited Injection |
0900-0930 |
Prepare for Linac Access |
OPS |
No injection |
0930-1130 |
Remove RG1 cradle |
Gagliano, Hoyt, Pasky |
Linac Access |
1130-1200 |
Recover from Linac Access |
OPS |
No injection |
1200-1400 |
Set up P0 feedback and test tune measurement for hybrid pattern |
Yao |
Stored beam & inj. |
1400-1800 |
Study APS-U lattice |
Sajaev/Xiao |
Stored beam & inj. |
1800-2200 |
study the correlation between beam steering and scraper temperature |
Harkay/ Xiao/Chae |
Stored beam & occ. inj. |
2200-2400 |
CPU AC study |
Xiao |
Stored beam & inj. |
|
Wednesday, October 27, 2010 |
|
|
0000-0200 |
CPU AC study |
Xiao |
Stored beam & inj. |
0200-0630 |
OPEN |
|
|
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |