Machine Studies
Draft Schedule for Run03-5, 2010
November 2nd 0800 – November 3rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, November 02, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0900-1000 |
Phase noise measurements RF3 & 4 |
Horan |
No Beam |
0900-1000 |
Troubleshoot Linux NFS problem |
Sersted |
Stored Beam & Injection |
0900-1000 |
Reconnect bitbus fiber link to iocs35vp |
Stein |
No Beam |
0900-1000 |
Take measurements in PAR RF-1 #2 |
Smith |
Limited Injection |
0900-1100 |
Investigate S29/30 NbBPM glitches |
Diag |
No beam |
0900-1000 |
Investigate S12C:H1 :V1 control hardware |
Wang |
No beam |
0900-1100 |
Update firmware for S38 FPGA based |
Bui |
No Beam |
1000-1100 |
PAR requalifications |
Pasky/?? |
Limited injection |
1100-1130 |
Check reboot of RF IOCs |
DiMonte |
Stored beam |
1130-1300 |
Investigate unexpected behavior of quads and sextupole during SCR ramp/Investigate DownDoubleSector PEM |
Schroeder |
Stored beam & inj. |
1300-1700 |
Hybrid lattice adjustments |
Sajaev |
Stored beam & injection |
1700-2100 |
APS-U lattice |
Sajaev |
Stored beam & inj. |
2100-2300 |
P0 feedback with reduced chromaticity for hybrid pattern |
Yao |
|
2300-2400 |
Optimize Booster Tune Waveforms |
Yao |
Occ. Injection available |
2300-2400 |
CPU study |
Xiao |
Stored Beam Occ. Inj. |
|
Wednesday, November 03, 2010 |
|
|
0000-0300 |
Optimize Booster Tune Waveforms |
Yao |
Occ. Injection available |
0000-0300 |
CPU Study |
Xiao |
Stored beam & occ. inj |
0300-0700 |
Gas bremsstrahlung (GB) studies in sector 35 |
Dooling/Yang |
Stored beam & inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |