Machine Studies
Schedule for Run03-7, 2010
November 15th 0800 – November 17th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 15, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/ OPS |
Stored Beam & Injection |
0900-0930 |
Set-up RF systems for high current |
RF Group |
No beam |
0900-0930 |
Change MPS for 150mA study & disable gaps |
Smith, M. |
No beam |
0930-1130 |
Set up 8RLSS lattice for high current studies |
Sajaev |
Stored beam & inj. |
1130-1600 |
High current study |
Harkay |
Stored beam & inj. |
1600-1630 |
Return RF to normal User operations |
RF Group |
No beam |
1600-1630 |
Return MPS and ID gaps to normal User Operations |
Smith, M. |
No beam |
1630-1700 |
Verify recovery to 102mA operations |
Sajaev/Xiao |
Stored beam & inj. |
1700-2100 |
Set up RHB lattice |
Sajaev/Xiao |
Stored beam & inj. |
2100-2400 |
Orbit Switch |
Xiao |
Stored beam & inj. |
|
Tuesday, November 16, 2010 |
|
|
0000-0200 |
Orbit Switch |
Xiao |
Stored beam & inj. |
0200-0630 |
Measure gas bremsstrahlung power in S35 while varying the beam current over its normal operating range (324 singlets) |
Dooling/ Yang |
Stored beam & inj. |
0630-0900 |
Set-up PAR |
Pasky/Smith T. |
No injection |
0800-1000 |
Modify MSL200 in iocs35bpm |
Pietryla |
No Beam |
0900-1000 |
Replace SCDU card at S18A:P2. Will require rebooting IOCS17BPM |
Keane |
No Beam |
0800-1100 |
Test prototype phase shifter at RF3 |
Horan |
No Beam |
0800-1100 |
Thermal scan Zone A & F converters |
Puttkammer |
No Beam |
0900-1100 |
RG1 tests |
|
No injection |
1100-1200 |
Test SCR ramp with restore |
Shang/ Schroeder |
Stored beam |
1200-1400 |
Test booster energy saving mode with Top-up |
Yao, Shang |
Stored beam & injection |
1400-1700 |
Continue measure threshold of hybrids fill with reduced chromaticity with and without P0 feedback |
Yao/ Sajaev |
Stored beam & injection |
1700-2300 |
Studies |
Sajaev |
Stored beam & inj. |
2300-2400 |
BPM studies |
Decker |
Stored beam & inj. |
|
Wednesday, November 17, 2010 |
|
|
0000-0630 |
BPM studies (continued) |
Decker |
Stored beam & inj. |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |