Machine Studies
Schedule for Run01-1, 2011
January 25th 0800 – February 1st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, January 24, 2011 |
|
|
0900-1000 |
Switch to RF1 |
RF group |
No beam |
1000-2400 |
RF conditioning. |
OPS |
Stored beam and injection |
|
Initial Pin-hole camera set-up. After 50mA is achieved. Parallel to RF conditioning. |
Yang |
Stored beam and injection |
|
Tuesday, January 25, 2011 |
|
|
0000-0800 |
RF conditioning (continued). |
OPS |
Stored beam and injection |
0800-1000 |
BPLD validation. |
Bui |
Stored beam and injection |
1000-1200 |
RF bpm checkout. |
Hahne |
Stored beam and injection |
1200-2000 |
Initial bpm checkout. |
Decker |
Stored beam and injection |
2100-2400 |
Beam induced multipacting. |
Harkay Yao Dooling |
Stored beam and injection |
|
Wednesday, January 26, 2011 |
|
|
0000-0300 |
Beam induced multipacting. |
Harkay Yao Dooling |
Stored beam and injection |
0300-0600 |
OPEN |
|
|
0600-0800 |
LINAC P.S. software testing/debugging |
Soliday |
Limited injection |
0800-0900 |
Verify S12C:HV1 connection. |
Schroeder |
Stored beam and injection |
0900-1300 |
Orbit recovery, measure ID29 bpm offsets. |
Xiao Sajaev |
Stored beam and injection |
1300-1700 |
Set up 24 singlets lattice (injection, beta functions). |
Xiao Sajaev |
Stored beam and injection |
1700-1800 |
Set up booster ramp correction special configuration. |
Yao Shang |
No injection |
1800-2200 |
Set up hybrid (injection, beta functions). |
Sajaev |
Stored beam and injection |
2200-2400 |
Intermediate bpm checkout with various fill patterns. |
Decker |
Stored beam and injection |
|
Thursday, January 27, 2011 |
|
|
0000-0600 |
Intermediate bpm checkout with various fill patterns (continued). |
Decker |
Stored beam and injection |
0600-0800 |
SR PEM checkout. |
OPS/Schroeder |
Stored beam and injection |
0800-0900 |
Remove shutter blocks on S29-ID FE |
Banks |
Access Zone E |
0800-0900 |
Swap leads on S12C:H1:PS |
Puttkammer |
No Beam |
0800-1200 |
PSS shutter checkouts |
SI group |
No Beam |
0800-0900 |
Switch standby pump 516 over to primary pump 515 (P.S. in affected sectors set to 0) |
Bracken |
No beam |
0900-1100 |
test SR converter P1 and P2 cables with the glitch detector running |
Puttkammer |
No beam |
0800-1200 |
Verify RG1 and RG2 files and interlocks. Parallel to PSS shutter checkouts. |
Pasky |
No beam |
0800-1200 |
Switch RF1. |
RF group |
No beam |
0800-1000 |
Investigate Booster RF cav. Coupler body trips |
RF group |
No beam |
0900-1100 |
Install Lebera chassis in the Sector 35-05 rack. |
Erwin/Gold |
No impact |
1200-1600 |
CPU checkout and setup. With 324 bunches. |
Xiao |
Stored beam |
1200-1500 |
Measure BTS emittance. Parallel to CPU checkout. |
Yao Sereno |
No injection |
1600-2000 |
Set up orbit in sectors 39 and 40 for better injection. |
Sajaev |
Stored beam and injection |
2000-2400 |
Loss monitor calibration. |
Yang |
Stored beam and injection |
|
Friday, January 28, 2011 |
|
|
0000-0500 |
BPM offset measurements |
OPS |
Stored beam and injection |
0500-0900 |
Booster ramp correction with different LP filter. |
Yao |
No injection |
0900-1200 |
FPGA data collection. |
Wang |
Stored beam and injection |
1200-2000 |
Libera testing. |
Decker Hahne Xu Yang |
Stored beam and injection |
2000-2400 |
CPU checkout and setup. |
Xiao |
Stored beam and injection |
|
Saturday, January 29, 2011 |
|
|
0000-0600 |
Single bunch vs multibunch instability thresholds vs chromaticity. |
Harkay |
Stored beam and injection |
0600-1200 |
BPM offset measurements. |
OPS |
Stored beam and injection |
1200-2000 |
Libera testing. |
Decker Hahne Xu Yang |
Stored beam and injection |
2000-2400 |
Set up S32 RHB lattice. |
Xiao |
Stored beam and injection |
|
Sunday, January 30, 2011 |
|
|
0000-0800 |
Verify top-up. |
OPS |
Stored beam and injection |
0800-1200 |
P0 feedback setup for user operation. |
Yao Gold |
Stored beam and injection |
1200-1800 |
Sawtooth instability investigation with P0 feedback. |
Harkay Yao |
Stored beam and injection |
1800-2400 |
Digital camera commissioning. |
Yang |
Stored beam and injection |
|
Monday, January 31, 2011 |
|
|
0000-0100 |
OPEN |
|
|
0100-0700 |
Test failed sextupole corrcetions. |
Sajaev |
Stored beam and injection |
0700-1100 |
RTFB investigation. |
Lenkszus Emery |
Stored beam and injection |
1100-1500 |
Final bpm checkout. |
Decker |
Stored beam and injection |
1500-1700 |
Final pinhole camera setup. |
Yang |
Stored beam and injection |
1700-1900 |
Bunch purity setup. |
Yang |
Stored beam and injection |
1900-2300 |
Digital camera commissioning. |
Yang |
Stored beam and injection |
2300-2400 |
Loss monitor calibration. |
Yang |
Stored beam and injection |
|
Tuesday, February 01, 2011 |
|
|
0000-0300 |
Loss monitor calibration. |
Yang |
Stored beam and injection |
0300-0630 |
Injection optimization automation. |
Sajaev |
Stored beam and injection |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |