Machine Studies

Schedule for Run01-1, 2011

January 25th 0800 – February 1st 0800

Time

Descriptions

Studiers

SR Status


Monday, January 24, 2011



0900-1000

Switch to RF1

RF group

No beam

1000-2400

RF conditioning.

OPS

Stored beam and injection


Initial Pin-hole camera set-up. After 50mA is achieved. Parallel to RF conditioning.

Yang

Stored beam and injection


Tuesday, January 25, 2011



0000-0800

RF conditioning (continued).

OPS

Stored beam and injection

0800-1000

BPLD validation.

Bui

Stored beam and injection

1000-1200

RF bpm checkout.

Hahne

Stored beam and injection

1200-2000

Initial bpm checkout.

Decker

Stored beam and injection

2100-2400

Beam induced multipacting.

Harkay Yao Dooling

Stored beam and injection


Wednesday, January 26, 2011



0000-0300

Beam induced multipacting.

Harkay Yao Dooling

Stored beam and injection

0300-0600

OPEN



0600-0800

LINAC P.S. software testing/debugging

Soliday

Limited injection

0800-0900

Verify S12C:HV1 connection.

Schroeder

Stored beam and injection

0900-1300

Orbit recovery, measure ID29 bpm offsets.

Xiao Sajaev

Stored beam and injection

1300-1700

Set up 24 singlets lattice (injection, beta functions).

Xiao Sajaev

Stored beam and injection

1700-1800

Set up booster ramp correction special configuration.

Yao Shang

No injection

1800-2200

Set up hybrid (injection, beta functions).

Sajaev

Stored beam and injection

2200-2400

Intermediate bpm checkout with various fill patterns.

Decker

Stored beam and injection


Thursday, January 27, 2011



0000-0600

Intermediate bpm checkout with various fill patterns (continued).

Decker

Stored beam and injection

0600-0800

SR PEM checkout.

OPS/Schroeder

Stored beam and injection

0800-0900

Remove shutter blocks on S29-ID FE

Banks

Access Zone E

0800-0900

Swap leads on S12C:H1:PS

Puttkammer

No Beam

0800-1200

PSS shutter checkouts

SI group

No Beam

0800-0900

Switch standby pump 516 over to primary pump 515 (P.S. in affected sectors set to 0)

Bracken

No beam

0900-1100

test SR converter P1 and P2 cables with the glitch detector running

Puttkammer

No beam

0800-1200

Verify RG1 and RG2 files and interlocks. Parallel to PSS shutter checkouts.

Pasky

No beam

0800-1200

Switch RF1.

RF group

No beam

0800-1000

Investigate Booster RF cav. Coupler body trips

RF group

No beam

0900-1100

Install Lebera chassis in the Sector 35-05 rack.

Erwin/Gold

No impact

1200-1600

CPU checkout and setup. With 324 bunches.

Xiao

Stored beam

1200-1500

Measure BTS emittance. Parallel to CPU checkout.

Yao Sereno

No injection

1600-2000

Set up orbit in sectors 39 and 40 for better injection.

Sajaev

Stored beam and injection

2000-2400

Loss monitor calibration.

Yang

Stored beam and injection


Friday, January 28, 2011



0000-0500

BPM offset measurements

OPS

Stored beam and injection

0500-0900

Booster ramp correction with different LP filter.

Yao

No injection

0900-1200

FPGA data collection.

Wang

Stored beam and injection

1200-2000

Libera testing.

Decker Hahne Xu Yang

Stored beam and injection

2000-2400

CPU checkout and setup.

Xiao

Stored beam and injection


Saturday, January 29, 2011



0000-0600

Single bunch vs multibunch instability thresholds vs chromaticity.

Harkay

Stored beam and injection

0600-1200

BPM offset measurements.

OPS

Stored beam and injection

1200-2000

Libera testing.

Decker Hahne Xu Yang

Stored beam and injection

2000-2400

Set up S32 RHB lattice.

Xiao

Stored beam and injection


Sunday, January 30, 2011



0000-0800

Verify top-up.

OPS

Stored beam and injection

0800-1200

P0 feedback setup for user operation.

Yao Gold

Stored beam and injection

1200-1800

Sawtooth instability investigation with P0 feedback.

Harkay Yao

Stored beam and injection

1800-2400

Digital camera commissioning.

Yang

Stored beam and injection


Monday, January 31, 2011



0000-0100

OPEN



0100-0700

Test failed sextupole corrcetions.

Sajaev

Stored beam and injection

0700-1100

RTFB investigation.

Lenkszus Emery

Stored beam and injection

1100-1500

Final bpm checkout.

Decker

Stored beam and injection

1500-1700

Final pinhole camera setup.

Yang

Stored beam and injection

1700-1900

Bunch purity setup.

Yang

Stored beam and injection

1900-2300

Digital camera commissioning.

Yang

Stored beam and injection

2300-2400

Loss monitor calibration.

Yang

Stored beam and injection


Tuesday, February 01, 2011



0000-0300

Loss monitor calibration.

Yang

Stored beam and injection

0300-0630

Injection optimization automation.

Sajaev

Stored beam and injection

0630-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection