Machine Studies
Schedule for Run01-10, 011
April 5th 0800 – April 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, April 05, 2011 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
B:BM output filter testing |
Feng |
No Injection |
0900-1100 |
Check inputs to Main MPS (RF systems off) |
Smith, M. |
No Beam |
0900-1100 |
Magnet readback repair (zones D & E) |
Puttkammer |
No Beam |
0900-1100 |
Linac training (09-15) |
Bogdan |
Limited Injection |
0930-1130 |
Replace failed blower at S38 |
Morrison |
Access Zone F |
1000-1100 |
Troubleshoot BPLD circuit at 32ID |
Grimmer |
Access Zone E |
1000-1100 |
Take pictures of the ID chamber, cables, support, and hardware |
Erwin |
Access Zone E |
1130-1200 |
Recover SR systems S32 BPLD validation |
OPS/Bui |
Stored Beam & Injection |
1200-1400 |
Booster injection response measurement |
Yao |
Booster injection |
1400-1600 |
P0 feedback script test. 24-singlets or single bunch |
Yao, Shang |
Occ. injection |
1600-2000 |
Xbpm alignment work |
Decker, Hahne |
Stored beam & injection |
2000-2400 |
Study coherent damping in the storage ring |
Harkay |
Stored beam & injection |
|
Wednesday, April 06, 2011 |
|
|
0000-0200 |
Study coherent damping in the storage ring (continued) |
Harkay |
Stored beam & injection |
0200-0700 |
Coupling correction algorithms study |
Sajaev |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |