Machine Studies

Schedule for Run01-5, 2011

February 28th 0800 – March 2nd 0800



Time

Descriptions

Studiers

SR Status


Monday, February 28, 2011



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1100

Test ITS PLC code

Pietryla

Stored Beam & Injection

0915-0930

29ID PSS end to end test

McNamara

No Beam

0930-1000

Replace 23BP4 Filter Comparator

Erwin

Access Zone C

0930-1030

Replace Cherenkov detectors at 29 & 30ID.

Brill

Access Zone E

0900-1300

PS vector mode script testing

Fors

No Beam

0900-1300

Repair magnet temp. noise in S14:15

Puttkammer

No Beam

0900-1100

Remove waveguide shorting plate at flange RFTS118

RF group

No Beam

1130-1230

Installation of new-version phase shifter card at RF3

RF group

No Beam & IOC reboots

1300

Fill SR with 324 bunches.

OPS


1300-1400

Linac training.

OPS

No injection

1400-1600

Linac PEM checkout.

Soliday Pasky

No injection

1300-1700

BPM offset measurements (parallel to inject work).

Sajaev

Stored beam

1400-1600

Fix B3C2P1 (parallel to injector work).

Erwin Yao

No impact

1600-2000

Test PC gun to PAR 1Hz operation mode.

Sereno Pasky Dooling Yao

No injection

2000-2400

Study fast ion effect in bunch trains.

Chae Yao

Stored Beam & Injection


Tuesday, March 01, 2011



0000-0100

Scraper position mesurement.

Dong Xiao

Stored Beam & Injection

0100-0500

Orbit switch.

Xiao

Stored Beam & Injection

0500-0800

Simulate APS-U aperture limitation with orbit bumps.

Xiao

Stored Beam & Injection

0800-1200

Measure booster chromaticity.

Yao

No SR beam

0800-1000

Troubleshoot S3B:H1 fault

Theres/ Puttkammer

Access Zone A

1200-1400

Test tuneFF adjustment tool.

Yao

Stored Beam & Injection

1400-1600

Adjust P0 feedback parameters.

Yao

Stored Beam & Injection

1600-1800

Test booster corrector ramp loading tool.

Shang Yao

Stored Beam & Injection

1800-2000

Collect FPGA data.

Wang

Stored Beam & Injection

2000-2400

CPU correction.

Xiao

Stored Beam & Injection


Wednesday, March 02, 2011



0000-0300

Verify APS-U 8RLSS setup with P0 feedback.

Sajaev

Stored Beam & Injection

0300-0630

Test coupling minimization algorithms.

Sajaev

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection