Machine Studies
Schedule for Run01-8, 011
March 22nd 0800 – March 23rd 0800
|
Time |
Descriptions |
Studiers |
SR Status |
|
|
Tuesday, March 22, 2011 |
|
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
|
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
|
0900-0930 |
Reboot iocrf3hvps |
DiMonte |
No Beam |
|
0900-1000 |
End to end tests at 13ID |
Budz |
No Beam |
|
0900-1100 |
Check timing signals at S13 |
Laird |
No Beam |
|
0900-1100 |
Main Ramping voltage regulator testing |
Wang |
No Injection |
|
0900-1100 |
Replace a Digitizer card in S15 feedback IOC crate (power cycle of IOCS15FB) |
Erwin |
No beam |
|
0900-1100 |
Investigate BPLD circuit problem S32 |
Grimmer |
No Beam |
|
0900-1200 |
Repair magent temp readback issues in Zone B, C & D |
Puttkammer |
No Beam |
|
0930-1330 |
Troubleshoot/repair RG-2 kicker |
Hillman |
Access Linac |
|
1330-1500 |
Recover SR beam, inject 324 bunches, Linac training. |
OPS |
Stored Beam & Injection |
|
1500-1700 |
Linac adjustments. |
Pasky |
Limited injection |
|
1700-2000 |
Test PC gun to PAR injection. |
Sereno |
Limited injection |
|
1400-1600 |
L1 shielding tests. Parasitic to other studies. |
Cours |
Stored Beam & Injection (parasitic study) |
|
1400-1900 |
Measure BPM offsets. |
Sajaev |
Stored beam |
|
2000-2400 |
Orbit switch. |
Xiao |
Stored Beam & Injection |
|
|
Wednesday, March 23, 2011 |
|
|
|
0000-0200 |
Test PAR tunerFF script. |
Harkay Yao |
No injection |
|
0200-0300 |
Optimize P0 feedback parameters. |
Yao |
Stored Beam & Injection |
|
0300-0400 |
Measure booster chromaticity. |
Yao |
No SR beam |
|
0400-0700 |
BPM studies. |
Decker |
Stored Beam & Injection |
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |