Machine Studies

Draft Schedule for Run02-1, 2011

May 25th 0800 – June 1st 0800

Time

Descriptions

Studiers

SR Status


Tuesday, May 24 (before studies)



0900-2400

Set up to store beam & rf conditioning with beam

Sajaev/Schroeder/OPS

Stored beam & inj.

1200-1600

Tune up SR tune measurement with the new stripline

Yao

Stored beam & inj.

1600-1800

S35BM pinhole camera setup for machine start up Greater than 50mA

Yang

Stored beam & inj.


Wednesday, May 25, 2011



0000-0800

RF conditioning with beam



0800-1100

BPLD Validation

Bui

Stored Beam & Injection

1100-1300

X-ray BPM checkout

Hahne

Stored beam & occ. inj.

1300-1730

Initial BPM checkout

Decker

Stored beam & inj.

1730-2200

Access to install cooling collars on S37 spool piece and infrared camera

Hoyt, et al

Erwin, et al

No beam

2200-2330

RF conditioning with 24 singlets

Harkay, Schoeder, OPS

Stored beam & inj.

2330-2400

Move thermocouple to downstream bellows in S37

OPS, Erwin

Access Zone F

2100-2300

Initial check-out of beam loss monitor at S4 (multiple beam dumps) MOVED

Yang

Stored beam & inj.

2300-2400

Orbit recovery MOVED

Sajaev

Stored beam & inj.


Thursday, May 26, 2011



0000-0300

Orbit recovery continued MOVED

Sajaev

Stored beam & inj.

0000-0200

Move thermocouple to downstream bellows in S37

OPS, Erwin

Access Zone F

0200-0800

Continue RF conditioning with beam (24 singlets)

Harkay, Schroeder, OPS

Stored beam & inj.

0300-0500

Injector training CANCELLED

Mazzio

Limited Injection

0500-0730

test P0 feedback applications Cancelled (may run parasitic to some other study).

Yao, Shang

Stored beam & Inj.

0800-1200

PSS shutter tests

SI Group

No Beam

1200-1600

Orbit recovery

Sajaev

Stored beam & inj.

1600-2000

Set-up 24 singlets

Sajaev

Stored beam & inj.

2000-2200

Initial check-out of beam loss monitor at S4 (multiple beam dumps)

Yang, Dooling

Stored beam & inj.


Friday, May 27, 2011



0000-0200

Injector training (23-07)

Mazzio

Limited Injection

0200-0600

CPU tune measurement

Emery, Dong

Stored beam, occ. inj.

0600-1200

CPU coupling measurement

Emery, Dong

Stored beam, occ. inj.

0800-1200

Run booster corrector bump scan with updated script

Yao Shang

Need booster inj.

1200-1500

MIA data acquisition with low current single bunch

Wang, C.

Stored beam & inj.

1500-2300

Intermediate BPM checkout

Decker

Stored beam & inj.

2300-2400

Injector training (23-11)

Bogdan

Limited Injection


Saturday, May 28, 2011



0000-0100

Injector training (23-11) (continued)

Bogdan

Limited Injection

0100-0700

BPM offset measurements

OPS

Stored beam & occ. inj.

0700-1100

Bunch Train, Fast Ion Study, special fill pattern

Chae, Harkay, Yao

Stored beam & inj.

1100-1500

Decoherence measurements of single and multiple bunches. (Need IK5, P0 feedback)

Harkay, Yao

Stored beam & inj.

1500-1900

Real-time feedback studies

Decker, Carwardine

Stored beam & inj.

1900-2400

Top-up verification

Ops

Stored beam & inj.


Sunday, May 29, 2011



0000-0300

Top-up verification

OPS


0300-0500

Injector training (23-11)

Bogdan

Limited Injection

0500-0900

OPEN



0900-1100

SR re-qualification

LaBuda/ Schroeder

Stored beam & inj.

1100-1300

SR re-qualification

Sutton/ Schroeder

Stored beam & inj.

1300-2400

OPEN




Monday, May 30, 2011



0000-0200

Injector training (23-07)

Bogdan

Limited Injection

0200-0400

SR re-qualification

Forth/LaBuda

Stored beam & injection

0400-0900

OPEN



0900-1400

CPU orbit correction

Emery/Dong

Stored beam & inj.

1400-2000

SR damping rate measurement with kick method

Yao, Harkay

Stored beam & inj.

2000-2200

Operator re-qualification

Karl/Sutton

Stored beam & inj.

2200-2400

Setup RHB lattice

Sajaev

Stored beam & inj.


Tuesday, May 31, 2011



0000-0200

Setup RHB lattice

Sajaev

Stored beam & inj.

0200-0400

Injector training (23-07)

Bogdan

Limited Injection

0400-0700

OPEN



0700-0800

Waveguide switch & MPS validation for RF3&RF4

RF Group/Flood or M. Smith

No beam

0700-0800

Replace water fittings at S15B:Q5:PS

Reinke/Vargas

No beam

0800-1200

Final BPM set-up (24 bunch user orbit top-up)

Decker

Stored beam & inj.

1200-1400

AM Noise Suppression Studies, Needs one additional injection

Berenc

Stored beam & occ. inj.

1200-1400

Injector training (07-15)

Mazzio

Limited injection

1400-1600

S35BM pinhole camera setup for user run

Yang

Stored beam & inj

1600-1800

S35ID/S36AM bunch purity monitor setup for user run

Yang

Stored beam & inj

1800-2200

Calibration and set up beam dump loss monitor (frequent beam dumps & fills)

Yang

Stored beam

2200-0200

Decoherence measurements of single and multiple bunches. CANCELLED

Harkay, Yao

Stored beam & inj.

2200-2400

Set-up hybrid

Sajaev

Stored beam & inj.


Wednesday, June 01, 2011



2400-0200

Set-up hybrid

Sajaev

Stored beam & inj.

0200-0600

Final setup, right before the beginning of user operation

Sajaev

Stored beam & inj.

0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection