Machine Studies

Schedule for Run02-10, 2011

August 2nd 0800 – August 3rd 0800



Time

Descriptions

Studiers

SR Status


Tuesday, August 02, 2011



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

RF waveguide switch from RF-3 to RF-2

Trento

No Beam

0930-1130

Install blanking plate at RFTS118

Horan

No Beam

0930-1030

Switch pump P-521 (Sectors 23&24) to standby and repair

Bracken

No Beam

0930-1130

repair RF5's MT door interlock

Trento

No beam

0930-1130

Refresh Linac zone B & C SF6

Vacuum group

No Injection

0930-1130

Measure Linac corrector supplies

Hillman

No Injection

0930-1130

BIK noise investigation

Puttkammer

No Injection

0930-1130

Replace magnet interlock interface boards in Zone A

Puttkammer

No Beam

0930-1230

Thermal image Zone C & D PS

Puttkammer

No Beam

0930-1230

Finish phase delay measurements

Horan

No Beam

1000-1030

Equipment mapping

Hahne

Access Zone A

1000-1030

Document wiring in S3

Farnsworth

Access Zone A

1300-1400

Radiation Survey with White Beam @ 4-ID-D

Wyncott

Stored beam

1300-1600

Vibration study ongoing for APCF construction (possible beam motion during this time period)

Stevens, A.

Stored beam

1300-1600

set up and test run booster orbitControllaw (can provide occasional injection

Yao, Shang

Occ. inj.

1600-1900

slow beam dump by rf-frequency

Chae, Yao

Stored beam & inj.

1900-2000

Booster training (15-23)

Bogdan

Limited injection

2000-2400

Orbit switch to RHB

Xiao

Stored beam & inj.


Wednesday, August 03, 2011



0000-0400

beam steering studies for SCU

Harkay, Boon, Xiao

Stored beam & occ. injection

0100-0300

Booster training (23-07)

Mazzio

Limited injection

0400-0700

measure fast corrector's transfer function and corrector error's PSD

in RTFB system.

Xu, Lenkszus

Stored beam

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection