Machine Studies
Schedule for Run02-12, 2011
August 16th 0800 – August 17th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, August 16, 2011 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables - verify changes to scan fits |
Schroeder, Shang |
Stored Beam & Injection |
0930-1000 |
Reboot ctlapps3L server to regain lost memory |
Shoaf |
No beam |
0930-1130 |
install new SR magnet interlock interface boards in S2 & S3 |
Puttkammer |
No beam |
0930-1130 |
B:ES2 trips on differential water pressure |
Puttkammer |
No injection |
0930-1130 |
Continue investigation of B:IK DAC noise |
Puttkammer |
No injection |
0930-1130 |
Investigate inconsistency between B1C6V and B1C2V ramps and ramp table |
Puttkammer |
No injection |
1130-1400 |
test booster orbit correction |
Yao, Shang |
Occ. Inj possible |
1200-1400 |
measure beam motion at current lattice (24 singlets RHB) and non-topup mode |
Xu, Lenkszus |
Stored beam |
1400-1600 |
test SR +1 bunch purity by varying booster parameters |
Yao |
Stored beam & inj. |
1600-1900 |
Slow beam dump script test |
Chae, Soliday, Yao |
Stored beam & inj. |
1900-2300 |
orbit switch to 324 singlets, RHB |
Xiao |
Stored beam & inj. |
2300-2400 |
Characterize CPU switching property |
Xiao |
Stored beam |
|
Wednesday, August 17, 2011 |
|
|
0000-0100 |
characterize CPU switching property (Continued) |
Xiao |
Stored beam |
0100-0630 |
4NLSS lattice |
Sajaev |
Stored beam & inj. |
0630-0800 |
Prepare for User beam (324 singlets, RHB) |
OPS |
Stored Beam & Injection |