Machine Studies

Draft Schedule for Run02-2, 2011

June 7th 0800 - June 8th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, June 07, 2011



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

1ID PSS end to end test

Friedman

No Beam

0930-1130

Troubleshoot BDCRH412 and 21AV3

Puttkammer

No Beam

0930-1130

Scan RF source frequency P0 feedback work

Yao

No Beam

0930-1130

Replace IR display meter on S37, C4 upstream

Morrison

No beam

0930-1130

Rf gun switch

Pasky

Limited Injection

1100-1130

Reboot iocsbpmdp to correct polarity problem at S34C:V1

Lenkszus

No beam

1130-1330

Test updates to RTFB response matrix measurement software

Sereno, Shang, Lenkszus

Stored beam

1130-1330

Troubleshoot Booster BPM modules

Yao, Erwin

Limited Injection

1130-1330

Troubleshoot L1:RG1:SC1:HZ P.S.

Hillman

No impact

1130-1330

Injector training (0930-15)

Mazzio

Limited Injection

1330-1400

Verify canted undulator steering at 34-ID after the iocsbpmdp reboot

Schroeder

Stored beam

1330-1530

Injector training (0930-15)

Bogdan

Limited Injection

1530-1600

Check lifetime with 10MV RF gap voltage (24 singlets, ID gaps closed -- Top-up)

Schroeder

Stored beam & injection

1600-1700

Explore harmonic beam excitation at low current (0.2mA)

Wang, C., Yao

Stored beam & injection

1700-1900

Check P0 feedback applications

Yao, Shang

Stored beam & injection

1900-2300

Run Booster Corrector bump scan

Yao, OPS

Occasional injection possible

1900-2400

Install/measure BPM offsets

Sajaev

Occasional injection

2300-2400

Set up hybrid

Sajaev

Stored beam & inj.


Wednesday, June 08, 2011



0000-0300

Set up hybrid (continued)

Sajaev

Stored beam & inj.

0300-0700

Tune scan & injection optimization

Sajaev

Stored beam & injection

0700-0800

Prepare for User beam

OPS