Machine Studies
Draft Schedule for Run02-3, 2011
June 14th 0800 - June 15th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 14, 2011 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1400 |
Swap klystrons |
Horan |
No beam. No Booster Injection |
0900-0930 |
Replace P0 feedback amplifier cord |
Gold |
No Beam |
0900-1200 |
Reboot lid iocs, iocliscope & iocrfgtsd1 |
Pietryla |
Limited injection |
1100-1130 |
Reboot iocbbpm1 |
Lenkszus |
No Injection |
1100-1300 |
Install CMPSI cards in iocs39fb |
Lenkszus |
No beam |
1100-1300 |
Troubleshoot B4C3H ground fault |
Hillman |
No Injection |
1100-1400 |
Check booster QD supply/magnet for cause of 360-Hz ripple increase |
Donley |
No Injection |
1200-1400 |
Injector training (0900-15) |
Bogdan |
Limited Injection |
1300-1400 |
Replace canted undulator regulator cards (S21) |
Fors |
No Beam |
1400-1430 |
Verify and adjust booster QD after PS group study |
Yao/Wang, J. |
No injection |
1400-1430 |
Verify canted undulator regulator card replacement in S21 |
Schroeder |
Stored beam |
1430-1600 |
Study beam excitation |
Wang, C./Yao |
Stored beam & inj. |
1600-1800 |
test and run booster corrector bump scan script |
Yao/Shang |
Occ. injection possible |
1600-1800 |
test DSP85 AC voltmeter corrector/bpm drive error response measurement and plotting script. |
Sereno/ Lenkszus |
Stored beam |
1800-1900 |
scan and setup P0 feedback delays (24 singlets) |
Yao |
Stored beam & injection |
1900-2100 |
Hybrid setup with P0 feedback |
Sajaev, Yao |
Stored beam & inj. |
2100-2300 |
Complete hybrid setup |
Sajaev |
Stored beam & inj. |
2300-2400 |
BPM offsets |
Sajaev |
Stored beam & inj. |
|
Wednesday, June 15, 2011 |
|
|
0000-0300 |
BPM offsets (continued |
Sajaev |
Stored beam & inj. |
0300-0700 |
multibunch instability studies, 0-100 mA, standard bunch patterns. |
Harkay/ Boon |
Stored beam & inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |