Machine Studies

Draft Schedule for Run02-5, 2011

June 27th 0800 - June 29th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 27, 2011



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1000

Install fast RF switch

RF Group

No Beam

0900-1000

Waveguide switch from RF3 to RF2

RF Group

No Beam

0900-1100

Replace canted undulator PS modules in S12 & S34

Puttkammer

No Beam

0900-1100

Refresh SF6 at RF guns

Michalek

No Injection

0900-1100

B:BM:PS zero-cross check

Wang

Limited Injection

0900-1100

Test RTFB upgrade to R3.14.11

Xu/Lenkszus

No Beam

0900-1200

Relocate BTM200 timing and swap beam history model in iocbpm1 and iocbbpm3

Keane

Limited Injection

0900-1200

Troubleshoot PAR RF-12

Smith

Limited Injection

0930-1030

Replace beam loss monitor at 4ID

Grimmer

Access Zone A

1000-1100

New phase shifter study at RF2

Berenc

No Beam

1200-1400

Test PAR harmonic

Pasky

Occ. injection

1100-1300

Install phase shifter board at RF4

Berenc

No Beam

1100-1230

Investigate cause of mismatch between S34C:[HV]1 operation/maintenance DAC

Puttkammer

No beam

1200-1400

SR Requalification test (1st hour with no beam - parasitic)

Ronzhin/ Schroeder

Stored beam & occ. injection

1400-1500

Test dump recording

Sajaev/Shang

Stored beam & inj.

1500-1800

CPU coupling correction

Emery

Stored beam

1500-1700

PAR console (15-23)

Bogdan/(Pasky)

Limited Injection

1800-2000

Vertical scraper studies

Emery

Stored beam & inj.

2000-2400

Orbit Switch to Hybrid

Sajaev

Stored beam & inj.


Tuesday, June 28, 2011



0000-0200

Orbit Switch to hybrid

Sajaev

Stored beam & inj.

0200-0400

Injector training (23-07)

Mazzio

Limited Injection

0400-0800

Single bunch accumulation limit

Harkay

Stored beam & inj.

0800-0900

4-ID-D Radiation survey with white beam

OPS/4-ID/ Wyncott

Stored beam & inj.

0900-1000

Test beam dump with one system

Sajaev

Stored beam & inj.

1000-1100

Remove RF fast switch after physics studies

RF Group

No Beam

1000-1100

Inspect sr sector 8 absorber chassis for possible cause of trip

Replace failing analog input card in sector 31 SR absorber interlock chassis.

Putnam

No Beam

1000-1200

investigate PAR RF and double bunch problem and test the new tunerFF application

Yao/Shang/ Harkay

Occ. Inj. possible

1100-1300

SR Requalification (1st hour no beam - parasitic to PAR study

Christensen/ Schroeder

Stored beam & inj.

1300-1500

measure booster emittance with synchrotron light monitor

Yao/Yang

Occ. inj. possible

1300-1600

collect response data using the DSP85 voltmeter

Sereno/Decker

Stored beam

1600-1800

booster injection controllaw response matrix measurement.

Yao

Limited injection

1800-2400

BPM studies

Decker

Stored beam & inj.


Wednesday, June 29, 2011



0000-0400

setup RHB lattice

Sajaev

Stored beam & Inj.

0430-0630

Injector training (23-07)

Mazzio

Limited Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection