Machine Studies
Schedule for Run03-1, 2011
September 27th 0800 – October 4th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, September 27, 2011 |
|
|
|
|
|
|
|
RF conditioning with stored beam |
|
Stored beam & inj. |
|
|
|
|
|
Wednesday, September 28, 2011 |
|
|
0000-0400 |
BPLD validation. |
Bui |
Stored Beam & Injection |
0400-0900 |
Initial bpm system checkout. |
Decker |
Stored Beam & Injection |
0900-1200 |
X-ray bpm checkout. |
Hahne |
Stored Beam |
0900-1200 |
Kx down mode file creation |
Pasky |
Limited Injection |
1200-1800 |
Orbit recovery. |
Xiao Sajaev |
Stored Beam & Injection |
1800-2000 |
Bunch purity monitor setup. |
Yang |
Stored Beam & Injection |
2000-2400 |
Investigate +1 bucket purity. |
Yao |
Stored Beam & Injection |
|
Thursday, September 29, 2011 |
|
|
0000-0500 |
Aperture Scan studies |
Harkay Boon |
Stored Beam & Injection |
0500-0600 |
OPEN |
|
|
0600-0615 |
Restart NFS services on Accel servers helios and selene. |
Thurman |
No new connections to network |
0615-0800 |
X-ray bpm checkout. |
Hahne |
Stored Beam |
0615-0800 |
Kx down mode file creation |
Pasky |
Limited Injection |
0800-1200 |
PSS shutter checkouts |
SI group |
No Beam |
0800-1000 |
Connect to 352MHz source and line amplifier in Bldg420 RmA014 |
Yoder |
No beam |
0800-1200 |
Access to replace Linac water load |
Pasky |
Linac ACCESS |
0800-1000 |
Test CPU code |
Smith |
No Beam |
0800-0900 |
RF waveguide switch |
RF Group |
No Beam |
0900-1100 |
Reboot several RF-related IOC |
DiMonte |
No beam |
1200-1400 |
SR training. |
Mazzio |
Stored Beam & Injection |
1400-2200 |
Intermediate bpm system checkout. |
Decker |
Stored Beam & Injection |
2200-2400 |
Set up 24 singlets lattice. |
Sajaev |
Stored Beam & Injection |
|
Friday, September 30, 2011 |
|
|
0000-0200 |
Set up 24 singlets lattice (continued) |
Sajaev |
Stored Beam & Injection |
0200-0700 |
Continue orbit recovery |
Xiao |
Stored Beam & Injection |
0700-0900 |
SR training. |
Mazzio |
Stored Beam & Injection |
0900-1100 |
Install and test booster dipole card. |
Wang Yao |
Stored Beam & Injection |
1100-1500 |
4NLSS lattice study. |
Sajaev |
Stored Beam & Injection |
1500-1800 |
Test effect of RF system state on booster QD/QF. |
Yao |
Stored Beam & Injection |
1800-2000 |
SR training. |
Bogdan |
Stored Beam & Injection |
2000-2400 |
Continue conditioning RF with beam (gaps will be disabled in software) |
OPS |
Stored Beam & Injection |
|
Saturday, October 01, 2011 |
|
|
0000-0800 |
Continue conditioning RF with beam (gaps will be disabled in software) |
OPS |
Stored Beam & Injection |
0800-1600 |
CPU setup 1 |
Xiao |
Stored beam & injection |
1600-1800 |
SR training. |
Bogdan |
Stored Beam & Injection |
1800-2400 |
BPM studies |
Decker |
Stored beam & injection |
|
Sunday, October 02, 2011 |
|
|
0000-1000 |
OPEN |
|
|
1000-1600 |
CPU setup 2. |
Xiao |
Stored Beam & Injection |
1600-1800 |
SR training. |
Bogdan |
Stored Beam & Injection |
1800-2400 |
Topup verification. |
OPS |
Stored Beam & Injection |
|
Monday, October 03, 2011 |
|
|
0000-0200 |
Topup verification. |
OPS |
Stored Beam & Injection |
0200-0400 |
SR PEM verification. |
OPS |
Stored Beam & Injection |
0400-0700 |
Kx down mode file creation |
Pasky |
Limited injection |
0700-0900 |
SR training |
Mazzio |
Stored beam & injection |
0900-0930 |
Restore MPS hardware limit |
Smith, Marty |
No SR beam |
0900-1000 |
Bldg. 420 RF waveguide switch |
Cours |
No SR beam |
1100-1500 |
RTFB study. |
Sereno Decker |
Stored Beam & Injection |
1500-1900 |
Final bpm system checkout. |
Decker |
Stored Beam & Injection |
1900-2100 |
Final optics setup. |
Yang |
Stored Beam & Injection |
2100-2300 |
SR training. |
Bogdan |
Stored Beam & Injection |
2300-2400 |
OPEN |
|
|
|
Tuesday, October 04, 2011 |
|
|
0000-0400 |
Final lattice setup. |
Xiao |
Stored Beam & Injection |
0400-0600 |
OPEN |
|
|
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |