Machine Studies
Schedule for Run03-12, 2011
December 20th 0000 – December 21th 0000
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, December 20, 2011 |
|
|
0000-0010 |
Collect XBPM orbit data. |
OPS |
Stored Beam & Injection |
0010-0130 |
Test longitudinal coupled-bunch instability. |
Harkay |
Stored Beam & Injection |
0130-0530 |
Continue 4NLSS+RHB setup. |
Sajaev |
Stored Beam & Injection |
0530-0700 |
Tune SR injection with Booster low emittance lattice. |
Yao Sajaev |
Stored Beam & Injection |
0700-0800 |
Measure Booster dispersion for low emittance lattice. |
Yao |
Stored Beam & Injection |
0800-1000 |
Prepare SR for high current operation. |
OPS |
Stored Beam & Injection |
1000-1400 |
Study gas Bremsstrahlung radiation at high currents. |
Dooling HP |
Stored Beam & Injection |
1000-1400 |
Monitor temperature of S37 vacuum tee (parallel to Bremsstrahlung studies). |
Harkay |
Stored Beam & Injection |
1000-1400 |
Phase noise measurements (parallel to Bremsstrahlung studies). |
Sereno |
Stored Beam & Injection |
1400-1800 |
Measure temperatures of vertical and horizontal scraper chambers as a function of local steering. |
Harkay |
Stored Beam & Injection |
1800-2200 |
Debug xbpm data collection script. |
Decker Shang |
Stored Beam & Injection |
2200-2400 |
Slow shutdown. |
OPS |
|