Machine Studies

Schedule for Run03-5, 2011

October 31st 0800 – November 2nd 0800

Time

Descriptions

Studiers

SR Status


Monday, October 31, 2011



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0930-1000

Test shutters at 29ID

McNamara

No Beam

0930-1030

Install vme module in iocbdg1

Laird

No Beam

0930-1130

Troubleshoot sectors 23 - 24 process water A-B PLC ethernet problem (pump 521 off)

Putnam

No beam

0930-1030

SRRF waveguide switch

Cours

No Beam

0930-1130

Vibration measurements (S28-31)

CANCELLED

Preissner

No Beam

0930-1130

move the current measurement from S32B:Q1/S32:BQ1 to S31A:Q5/S31B:Q5 (double sector off)

Puttkammer

No beam

0930-1230

Troubleshoot PAR RF-12

Smith

Limited Injection

1000-1100

Collect lead samples

Bechtold, ESH

Access Zone B

1230-1300

Recover SR beam.

OPS

Stored Beam & Injection

1300-1700

XBPM data collection script test.

Decker Hahne Shang

Stored Beam & Injection

1700-2100

Characterize/collect BnBPM data.

Bui Lill

Stored Beam & Injection

2100-2400

Set up hybrid lattice.

Xiao

Stored Beam & Injection


Tuesday, November 01, 2011



0000-0100

Set up hybrid lattice (continued).

Xiao

Stored Beam & Injection

0100-0500

DSP85 response measurements.

Sereno

Stored Beam & Injection

0500-0700

PEM testing for PAR RF.

Pasky

Limited injection

0700-0900

SR training. (last 1/2 hour no injection)

Mazzio

Stored Beam & Injection

0830-1030

Replace a RF12 500W amplifier

T. Smith

No Injection

0900-1100

check the Bergoz/filter/DBPLD interface labels in diagnostics cabinets around the ring

Sun

No impact

0900-1100

SR RF PEM testing. Parallel to PAR RF.

Soliday Horan Schroeder

Stored Beam & Injection

1030-1100

Check out PAR harmonic system

Yao

Limited Injection

1100-1300

Measure SR damping time.

Yao

Stored Beam & Injection

1300-1700

Orbit switch.

Xiao

Stored Beam & Injection

1700-2300

Tune up booster injection with 375MeV.

Yao Sereno

Limited injection

1700-2100

CPU measurements. Parallel to booster injection.

Xiao

Stored beam

2300-2400

Test ID steering to center of BPLDs.

Sajaev

Stored Beam & Injection


Wednesday, November 02, 2011



0000-0100

Test ID steering (continued).

Sajaev

Stored Beam & Injection

0100-0400

Continue P5 steering.

Sajaev

Stored Beam & Injection

0400-0700

Continue 4NLSS lattice.

Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection